-
North Fowlers Bay - Chundaria. Annual reports and progress reports for the periods 15/9/1993 to 14/9/1998, and 28/10/1998 to 12/3/1999.
North Ltd's Barton Project commenced in 1990 across a number of licences progressively taken out over the western Gawler Craton, which eventually came to include EL 1865. Initial exploration for heavy mineral sand in the Barton-Ooldea area, 100-200...-
Document
Published: 06 May 1999
-
Nuckulla Hill. Annual and final reports to licence expiry/full surrender for the period 12/7/2004 to 11/7/2009.
As part of a search for possible Tunkillia type structurally-controlled buried gold deposits within an area located approximately 120 km north-east of Ceduna, licensee Southern Gold targeted geochemical and geophysical anomalies that had previously...-
Document
Published: 27 Oct 1909
-
Lake Labyrinth (part of the Gawler Joint Venture Project). Data release made at the surrender of a subsequently renewed licence (EL 3252) : annual reports for the period 27/7/1994 to 26/7/1999.
Exploration for possible economic buried magmatic/epithermal/hydrothermal/metamorphic gold and copper deposits, which may have formed within Archaean and Proterozoic basement rocks in an area located approximately 24 km north-west of Kingoonya,...-
Document
-
Gosse and Kingoonya (part of the Mentor Project, and later the Kingoonya Project). Data release made at joint partial relinquishment upon licences' expiry/renewal: annual reports for the period 3/12/1997 to 28/9/2008. [Index Part 2 of 2].
In continuing exploration carried out by Mount Isa Mines Exploration (MIM) during 1998 on EL 1792 / 2467 Gosse and EL 1798 / 2466 Kingoonya, additional calcrete sampling and RC drilling (25 holes for 1590 m total penetration) took place at four...-
Document
-
Bulgunnia, Gosse and Kingoonya (the Mentor Project). Data release made at the surrender of subsequent licences : annual reports for the period 27/10/1992 to 15/11/1997. [Index entry Part 1 of 2 - a very long abstract is split between these two parts].
The Gawler Joint Venture partners (Dominion Mining and Resolute Resources) have been exploring three near-contiguous areas located in the north of the Tarcoola - Kingoonya district, seeking possible economic concealed epithermal/mesothermal...-
Document
-
Childara Well. Annual reports and final report to licence expiry/full surrender, for the period 19/2/2004 to 18/2/2009.
An area lying along the south-western margin of the Gawler Ranges has been explored by Minotaur Resources to assess the economic iron oxide - associated copper-gold mineralisation (IOCG) potential of near-coincident gravity and magnetic anomalies that...-
Document
Published: 23 Mar 1909
-
Andamooka Creek, Willaroo Dam, Island Dam and Stuart Shelf / Andamooka Ranges (the Stuart Shelf Project). Joint annual reports on activities undertaken by the Joint Venture consortium, for the period 11/10/1996 to 10/10/2009 [ Index Part 2 of 2 ].
As a result of the BHP Billiton takeover of the Stuart Range Project, the mineral exploration strategy was changed. Formerly, WMC had been looking for economical targets of >500 Mt size containing on average more than 2.4% copper equivalent....-
Document
-
Heartbreak Hill. Annual reports to licence expiry/full surrender, for the period 27/9/1996 to 26/9/1997.
Mulgathing Complex and Hiltaba Suite rocks were interpreted from aeromagnetic data obtained in areas located 10 km north of, 70 km south-east of, and 35 km south of Tarcoola. Calcrete sampling was followed by RAB drilling (178 holes, total 5047 m)...-
Document
-
Tarcoola - Kingoonya (Glenloth) areas. Joint annual reports, and first partial relinquishment report, for the period 4/3/1993 to 24/5/2001.
Exploration for Archaean lode-style gold and Hiltaba Suite granite-related hydrothermal Cu-Au in two licence sub-areas near Tarcoola targeted Archaean greenstone lithologies interpreted from aeromagnetic data, Mesoproterozoic intrusive-associated...-
Document
-
Data release - as updated [made at SA Director of Mines' discretion] : Island Dam, Stuart Shelf and Andamooka Ranges (the Stuart Shelf Project). Joint annual reports for the period 11/10/2009 to 30/6/2018.
Exploratory drilling carried out by BHP Billiton (BHPB) during the 2009-10 project reporting year took place at six prospects thought to have good IOCG mineralisation potential, based in part on earlier drilling results and also on refined target...-
Document
Published: 30 Aug 1918
-
PACE Copper Discovery Drilling (drilling partnerships with DSD and industry): Year 9 partnership DPY9-21 - Eyre Peninsula Project, Central Gawler Gold Province, Baggy Green North prospect biogeochemical anomaly. Drilling project final report.
Early in 2016, Adelaide Resources submitted a proposal to DSD for a grant of PACE Initiative Year 9 collaborative drilling project subsidy funds to help it drill ~80 exploratory aircore or RC holes for a total of approximately 8000 m to further...-
Document
-
Woorong Creek. Data release : annual reports submitted until the commencement of joint licence reporting on the Mabel Creek JV Project tenements, for the period 1/6/2000 to 23/3/2006.
Exploration currently underway for possible economic buried iron oxide - associated copper-gold (IOCG) mineralisation within Proterozoic basement on the Mabel Creek High, in one of two joint venture group project licence areas located approximately 45...-
Document
-
Lake Labyrinth (part of the Tarcoola Joint Venture Project). Second and third partial surrender reports, for the period 31/10/2001 to 8/2/2009.
Exploration for possible buried epithermal or hydrothermal gold deposits within the large variety of Archaean, Palaeoproterozoic and Mesoproterozoic basement rocks present in an area located from 20-30 km east of Tarcoola has targeted the potential of...-
Document
-
Data release [made at SA Director of Mines' discretion] : Lake Everard West (part of the Gawler Craton Joint Venture, and latterly part of the Tunkillia JV Project). Annual & surrender reports for the period 7/6/1996 to 18/05/2021.
An area with poor basement outcrop located approximately 60 km south of Tarcoola, which largely lies within the north-eastern corner of the Yellabinna Regional Reserve, is being explored primarily for possible economic fault or breccia-hosted...-
Document
-
Data release [made at SA Director of Mines' discretion] : Lake Labyrinth West - Lake Harris West area (the Glenloth JV Project). Annual reports to licence expiry/renewal, for the period 25/5/1998 to 10/7/2008.
Continued exploration for Archaean lode-style gold and Mesoproterozoic Hiltaba Suite granite-related hydrothermal Cu-Au within the retained southern former subarea 'B' of EL 2518 located ~40 km south-east of Tarcoola, where there is also potential...-
Document
Published: 08 Oct 1908
-
PACE 2020 Discovery Drilling 2012: Year 7 Drilling Partnership DPY7-11 - Renaissance Uranium Ltd, Tanner Dam Project, Gawler Range Volcanics - hosted primary uranium mineralisation, magnetic anomaly targets. Drilling project interim and final reports.
In execution of Renaissance Uranium's approved PACE 2020 Discovery Drilling 2012 project designated DPY7-11, which was partly subsidised by DMITRE to assist in company high-risk high-reward mineral exploration within South Australia, 2 exploratory RC...-
Document
-
Data release - as updated [made at SA Director of Mines' discretion] : Glenloth area (the Tarcoola JV Project). Annual reports for the period 11/7/2008 to 2/11/2018.
A biogeochemical sampling survey consisting of 20 lines (407 samples) was undertaken by the JV partners during August 2009, targeting buried gold mineralisation. Black Oak and Pearl Bluebush were the dominant deep-rooted plant species sampled and, to...-
Document
-
Data release [made at SA Director of Mines’ discretion] : Tarcoola. Annual reports to licence expiry/renewal, for the period 2/6/2003 to 1/6/2008.
Exploration Licence 3089 is located in the central Gawler Craton and is centred near the township of Tarcoola. Continuation of tenure over the same area, from former ELs 1827 and 2510, was renewed by Gravity Capital Ltd on 2/6/2003, and full licence...-
Document
-
Warrina. Annual reports and final report to licence expiry/full surrender, for the period 22/3/2006 to 14/11/2013.
Exploration of an area centred 65 km north-east of Coober Pedy has continued from the licensee's previous work aimed at evaluating the IOCG mineralisation potential of Mesoproterozoic basement-hosted, large and regionally significant coincident...-
Document
-
Tanner Dam North. Final report at licence full surrender, for the period 22/11/2012 to 26/2/2014.
An area centred approximately 130 km north-northwest of Kimba has been explored for possible economic primary uranium mineralisation, where the principal target is the igneous rock succession of Mesoproterozoic Gawler Range Volcanics (GRV) and...-
Document