-
RB 67/00028;Amdel 599 Extraction of sulphur from gypsum, part 1.
Background: Australia currently imports about 430 000 tons of elemental sulphur per year, valued at about $12,000,000 in 1966. The sulphur is purchased from Canada, the USA and Mexico. The annual production of elemental sulphur in these three...-
Document
Published: 01 Jul 1968
-
SADM/Amdel Project 1/1/49 : production of high-grade calcium carbonate products from limestone fines. Progress report nos 1 to 15 plus final report, parts 1 and 2, for the period March 1962 to August 1964.
In South Australia there are a number of limestone occurrences which have been worked for long periods, and a high tonnage of limestones fines has accumulated. These fines are of too low a grade to be used. The Department of Mines (SADM) requested of...-
Document
-
Data release - as updated [made at SA Director of Mines' discretion] : Salt Creek, Lochaber, Lake Hawdon, Kingston South-East and Kongorong. Joint annual reports for the period 19/11/1996 to 21/10/2018.
A number of shallow Neogene salt lakes, that extend in chain-like fashion along the length of the inner Coorong and its hinterland as far south as Lacepede Bay, have been investigated for possible economic evaporitic mineral deposits that may have...-
Document
Published: 19 Nov 2018