-
Data release - as updated [made at SA Director of Mines' discretion] : Brimpton Lake. Annual reports for the period 9/2/2005 to 8/8/2018.
An area of the southern Gawler Craton, which is located on Eyre Peninsula east of Elliston, is continuing to be explored for possible economic buried Archaean to Proterozoic bedrock-hosted primary base and precious metal deposits of inferred...-
Document
-
Data release - as updated : Whey Whey Creek (latterly part of the Walparuta Project). Annual reports plus final report at licence expiry/full surrender, for the period 18/7/2013 to 17/7/2020.
A very small (35 square km) area located ~35 km west-northwest of Olary and covering part of the Weekeroo Inlier is being explored for possible buried epigenetic stratiform Broken Hill type Pb-Zn-Ag and VHMS (volcanic hosted massive sulphide) style...-
Document
-
PACE Copper Discovery Drilling (drilling partnerships with DSD and industry): Year 9 partnership DPY9-42 - Mount Woods Project area, Gawler Craton: assessing the potential for ISGC style mineralisation within the Mount Woods Inlier. Drilling final report
Historically, exploration undertaken for finding Iron Oxide - associated Copper-Gold (IOCG) mineralisation on the eastern Gawler Craton, over the long period since the discovery of the Olympic Dam deposit in July 1975, has targeted positive gravity...-
Document
-
PACE Copper Discovery Drilling (drilling partnerships with DSD and industry): Year 9 partnership DPY9-11, Thurlga Ramp, northern edge of Cleve Domain, volcanic epithermal / hydrothermal replacement type precious metal prospects. Drilling final report.
A licence area, which lies adjacent on the west to Investigator Resources' Peterlumbo Hill EL 5368 containing the Paris silver deposit (where there is a currently inferred resource of 42 Moz @ 139 ppm Ag), is being explored under a joint venture with...-
Document
-
The Northern Eyre Peninsula JV Project. Data release made in lieu of submitting a licence final report at the full surrender of EL 5170 Kimba Gap: Joint annual reports for the period 1/2/2013 to 9/2/2017.
During the Northern Eyre Peninsula Project (NEPP) 2013-2014 reporting year, exploration field work took place on two of the six project tenements. On EL 4884 Minbrie, a single 151 m deep vertical RC drillhole, BURC092, was completed in August 2013,...-
Document
Published: 25 Sep 1918
-
Kimberlites near Orroroo, South Australia.
A suite of Jurassic kimberlite dykes occur near Orroroo, South Australia. They range in thickness from a few millimetres to 30 metres. The intrusions are all extensively altered at surface, but a few of them are petrographically similar, and have...-
Document
Published: 31 Aug 1982
-
ExpNotes WHYALLA: Explanatory Notes WHYALLA
There is no abstract created for this record-
Document