Clare Valley groundwater resources. Progress report 4: drilling Phases III and IV.
Two additional phases of the drilling program to assess the groundwater resources in the Clare Valley were undertaken during March 1998 at Wendouree (Phase III), and during July 2000 at Wendouree and Watervale Oval (Phase IV). The Phase III program...-
Document
-
RB 98/00015 Clare Valley groundwater resources. Progress report 1 - Hydrogeology, drilling and groundwater monitoring.
A fundamental question remains to be answered in the Clare Valley. How much water can be safely extracted without causing depletion of the groundwater resources? This question is being addressed by a major investigation into the groundwater...-
Document
Published: 01 Oct 1998
-
RB 98/00014 Clare Drilling. Phase 2 - June 1997.
Phase Two of a drilling program at Clare, South Australia was undertaken in June, 1997. A total of 6 bores were drilled, 4 of these at existing locations established during Phase One drilling in January, 1996, and a further 2 at Watervale Oval as...-
Document
Published: 01 Mar 1998