Data release - as updated [made at SA Director of Mines’ discretion] : Tarcoola. Annual reports for the period 2/6/2008 to 29/7/2018.
During the first year of renewed EL 4167, in October and November 2008, Stellar Resources Ltd ("Stellar") completed a 5 hole, 1286.9 m RC and 2 hole, 157.1 m diamond cored inclined drilling programme at the Coolybring prospect which is located...-
Document
Published: 11 Sep 1918
-
Commonwealth Hill. Annual reports to licence expiry/non-renewal, for the period 9/8/2012 to 8/8/2017.
An area centred ~20 km north of the Challenger gold mine has been explored for possible buried primary Challenger type basement gold lodes and also for secondary roll-front style uranium mineralisation that may be hosted in buried Tertiary fluvial...-
Document
Published: 14 Nov 1915
-
Barton West and Barton East (initially part of the Gawler Joint Venture Project). Data release made in lieu of submitting a third partial surrender report for the latter licence : joint annual reports for the period 14/3/2001 to 11/1/2011.
The trigger event causing this data release to be made is that three portions of licence ground that together cover ~289 square km or 19.5% of the former area of EL 4217 Barton East have now been relinquished, as of 11/1/2011. No corresponding partial...-
Document
Published: 09 Mar 1911
-
RB 2010/00015 Constraints on the timing of brittle faulting at [the] Challenger Mine.
The orebody at the Challenger gold mine shows remarkable down-plunge continuity, from the surface to some 1400 m vertical depth, which is geometrically equivalent to a down-plunge length of ~2800 m. However, at ~220 RL within the mine, the orebody is...-
Document
Published: 01 Aug 2010