-
Lake Frome South, Central Lake Frome and Lake Frome North areas (the Lake Frome Potash Project). Joint annual reports plus final report to licences' joint full surrender, for the period 5/1/2015 to 26/4/2018.
The entire extent of the main Lake Frome salina was taken up in early 2015 with three contiguous licences covering a total area of 2718 square km, to explore for a salt lake brine potash resource which might be economic to develop to supply the local...-
Document
Published: 30 Apr 1918
-
Gas chromatographic analysis of Tirrawarra oil, and chemical analysis of Tirrawarra and Moorari coals.
In September 1971, CSIRO was supplied by the Delhi International Oil Corporation with eight coal samples and one oil sample from the Moorari No.l, Tirrawarra No.l and Tirrawarra No.2 ·Wells. The hydrocarbons extracted from the coal samples were...-
Document
-
Lake Torrens Areas 1 and 2, Lake Torrens South and Lake Torrens North (the Lake Torrens Brine Potash Project). First joint annual report plus final report to licences' joint full surrender, for the period 5/1/2015 to 16/6/2016.
Much of the eastern side of the very large, 5,745 square km saline playa Lake Torrens, which occupies one of the most arid parts of Australia, was taken under licence by a Northern Territory - based company with the intent of systematically sampling...-
Document
Published: 14 Jun 1916