-
RB 97/00023 Hydrogeology of the Moorook New Residence irrigation district.
Following a request from the SA Department of Environment and Natural Resources at Berri in the Riverland, a hydrogeological assessment of the Moorook and New Residence irrigation areas was carried out. The water table aquifer occurs in fine to...-
Document
Published: 01 Apr 1997
-
RB 95/00022 Five year technical review, 1991-1995 - Border (Groundwater Agreement) Act, 1985.
The Groundwater (Border Agreement) Act of 1985 legislated to provide a framework for the joint management of groundwater resources within a 40 km wide strip along the length of the South Australian and Victorian Border, which is referred to as the...-
Document
Published: 01 Jun 1995
-
RB 96/00017 River Murray water resource management. Assessment of salt load impacts and drainage hazard for new irrigation development along the River Murray in South Australia.
The Murray-Darling Basin Commission (MDBC) has a commitment in the national interest to managing the health of the River Murray and floodplain environment by mitigating both decreases in river water quality and associated environmental degradation...-
Document
Published: 01 May 1996
-
PACE Copper Discovery Drilling (drilling partnerships with DSD and industry): Year 9 partnerships DPY9-43 - Brownlow and DPY9-47 - Bower. Drilling projects' joint interim and final reports.
Copper and gold mineralisation associated with felsic, intermediate and mafic igneous intrusive rocks which have intruded Adelaidean and Cambrian metasediments in the Nackara Arc region has been the target of exploratory drilling conducted with the...-
Document
-
SA/Vic Border Groundwater Review Committee - Five-year technical review, 1996 - 2000.
The Groundwater (Border Agreement) Act of 1985 provides the legislative framework for the joint management of the groundwater resources along the South Australia/Victoria State border. The Act established a 40 km wide Designated Area along the...-
Document
-
Data release - as updated [made at SA Director of Mines' discretion] : Murray Basin Project. Joint annual reports, plus individual licence final reports at their respective full surrender, for the period 19/12/1997 to 30/6/2018.
Previous investigations of the Late Tertiary Murray Basin shallow marine littoral zone clastic sedimentary sequence (Loxton and Parilla sands) for heavy mineral sand (HM) placer accumulations have discovered numerous occurrences of economic to...-
Document