-
Petroleum exploration and development in South Australia (4th edition).
There is no abstract created for this record-
Document
-
Hamilton Creek. Quarterly and presentation reports for the period 22/11/1976 to 22/11/1978.
Exploration for base metals, over an area extending 50 km southwest from Moolowatana, was subtendered to Aquitaine Australia Minerals for two years by North Flinders Mines under a joint venture agreement. A program of geophysical appraisal of known...-
Document
Published: 23 May 1978
-
State Energy Research Advisory Committee (SENRAC) Project 2/86 - Moomba and Big Lake Fields, log and special core analysis for improved reserves assessment. Analytical data and progress reports for the period August 1987 to January 1989.
This project, initiated and managed by SADME, aimed to improve in-house methods of petrophysical log analysis in order to more reliably estimate producible gas reserves in the Moomba and Big Lake Fields, via more accurate estimation of reservoir...-
Document
Published: 18 Jan 1989
-
Innamincka 3 area (part of the Sturt Joint Venture Project). Final report at licence expiry/full surrender, for the period 25/2/2008 to 24/2/2013.
A large area centred ~80 km north-east of Moomba has been explored for possible buried economic Tertiary to Recent sedimentary uranium mineralisation of roll front style, similar to what occurs as fluvial sandstone - hosted giant secondary deposits...-
Document
Published: 20 Jan 2014
-
Gawler Project Central Tenement Block [Part]. Data release at licences' joint partial relinquishment: project combined annual reports, plus Southern Gold gold exploration JV - specific annual reports, 27/10/2004 to 30/6/2009. [Index Part 1 of 2].
During the first three years of the subject reporting period, exploration carried out by Dominion Mining as Gawler Project sole owner and operator was concentrated in and around the Challenger gold mine, to assist in defining ore reserves within the...-
Document
Published: 02 Feb 2010
-
Data release - as updated [made at SA Director of Mines’ discretion] : Warramboo (the Central Eyre Project). Annual reports [but excluding four separately held joint annual reports] for the period 6/6/2001 to 8/2/2019.
During the sixth year of tenure of the Warramboo licence, now held by Adelaide Exploration Limited as renewed EL 2846 covering the same 1363 square km area as before, the only exploration-related activity which occurred was the acquisition during...-
Document
Published: 28 Mar 2018
-
Sturt Joint Venture Project. Final report at 14 (of 18) project licences' combined surrender, for the period 25/2/2008 to 31/12/2013.
A very large area of the remote far north-east of the State was taken up early in 2008 by the unlisted Thorne-Clarke family company, to explore for sediment-hosted secondary uranium mineralisation of the type found in intracratonic sedimentary basins...-
Document
Published: 30 Apr 2014
-
Phar Lap Outstation. Combined first annual/final report at licence full surrender, for the period 17/7/2018 to 22/11/2019.
An area centred ~228 km south-southeast of Coober Pedy has been explored for possible buried IOCG type mineralisation, which could have formed in Mesoproterozoic basement rocks in a position which it was thought had not been properly tested by past...-
Document
Published: 12 Sep 2019
-
Mount Freeling and Wooltana [Station] areas. Annual reports to licence expiry/full surrender, for the period 28/6/2010 to 27/6/2015.
An area of the central far northern Flinders Ranges consisting of two separate sub-blocks has been explored for possible economic iron ore / manganese mineralisation which could be present within the unconformable contact between Mesozoic and...-
Document
Published: 29 Sep 2015
-
PACE 2020 Discovery Drilling 2012: Year 7 Drilling Partnership DPY7-39 - Beach Energy Limited - Murteree Shale, Coalbed Methane and Shale Gas Evaluation Project - new drill core for shale gas resource and deliverability analysis. Drilling final report.
Marsden 1 is located regionally on the eastern edge of the Battunga Trough, approximately 25 km south-west of the Toolachee Gasfield and 22 km east south-east of the Limestone Creek / Biala Oilfield. It was drilled as an exploration well to evaluate...-
Document
Published: 10 Jul 2013
-
PGSA 001 Volume 1 Otway Basin (Second edition) Petroleum geology of South Australia.
This monograph presents an integration and summary of all new data, and a consolidation of current concepts and ideas on the geological history, discovered fields and petroleum potential of the Otway Basin in South Australia. Many of these...-
Document
Published: 01 Aug 2002
-
Blackford and Lochaber (the Kingston Lignite Project). Individual licence reports and a joint annual report, plus final report at the full surrender of the remaining (Blackford) licence, for the period 3/8/2005 to 20/2/2015.
The Kingston coal (lignite) deposit, delineated by Western Mining Corp. in the early 1980s, has been re-assessed for the energy generation potential its coal represents, viewed in the context of recent increased demand for liquid transport fuels and...-
Document
Published: 02 Mar 2015
-
Willow Springs. Annual reports and final report to licence expiry/full surrender, for the period 1/12/2011 to 30/11/2016.
An area centred ~65 km north-east of Hawker in the Central Flinders Ranges, and located adjacent to the eastern side of the Oraparinna Diapir, has been explored for possible buried economic epigenetic copper, gold and uranium mineralisation. During...-
Document
Published: 03 Jan 2017
-
Data release - as updated [made at SA Director of Mines' discretion] : Camel Lake. Annual reports to licence surrender for the period 16/11/2012 to 15/11/2023.
An area located ~ 70 km north-east of Ooldea Siding and 50 km east of Maralinga is being explored for the industrial mineral kaolin, and more particularly its crystallographic form halloysite, which typically occurs as microtubules or nanotubes which...-
Document
Published: 21 Nov 2023
-
RB 2011/00004 [South Australian] Minerals Scorecard, 2009-2010.
The Minerals value-chain Scorecard, initiated in 2001, provides information regarding the performance of South Australia's mineral industry across the exploration, investment, production, processing and export stages of wealth creation. In doing so,...-
Document
Published: 01 Mar 2011
-
RB 2008/00016 Review of the Burra Mine Project, 1980-2008 - a progress report.
The Burra (Burra) Mine, situated 150 km north of Adelaide within the Adelaide Geosyncline, produced 2.7 million tonnes of copper ore in two major mining phases - 1845-1877 and 1970-1981. The first phase was initially progressed by underground...-
Document
Published: 01 Jan 2009
-
Kidman North 1. Test reports.
Contains contractors results and Unit gasfield operators reservoir engineering interpretations of the single rate and modified isochronal gas production tests conducted on the Toolachee Formation (Upper production zone) and Patchawarra Formation...-
Document
-
PEPS South Australia
PEPS South Australia is now a web based system containing a wide range of technical data relevant to the petroleum and geothermal industries. Currently accessible modules and data include: Well Details, Log Prints, Logs Digital and Production Summary...-
Application
Published: 01 Jan 2019
- JPEG
-
Petroleum wells
This layer contains details of all petroleum wells available in digital form-
Dataset
- TAB,
- KMZ,
- SHP,
- GDB
-
Moomba 16, Moomba 17, Moomba 20 and Moomba 23 areas (part of the Sturt Joint Venture Project). Combined first partial surrender report, for the period 25/2/2008 to 31/12/2013.
Majority portions of four licences from a large, multi-licence acreage package that is centred on the Moomba gas processing plant have recently been relinquished owing to the exit of a joint venture partner from the project exploration consortium,...-
Document
Published: 30 Apr 2014