Clare Valley groundwater resources. Progress report 4: drilling Phases III and IV.
Two additional phases of the drilling program to assess the groundwater resources in the Clare Valley were undertaken during March 1998 at Wendouree (Phase III), and during July 2000 at Wendouree and Watervale Oval (Phase IV). The Phase III program...-
Document
-
RB 77/00093 Little Para Dam, geological assessment of the quarry and water treatment works.
Fracture data taken from the excavated batters of the quarry was studied stereographically. It is concluded that the vertical batters are stable and will not suffer large scale planar failure.- Quarry floor foundation conditions are acceptable for the...-
Document
Published: 01 Jan 1977
-
RB 98/00015 Clare Valley groundwater resources. Progress report 1 - Hydrogeology, drilling and groundwater monitoring.
A fundamental question remains to be answered in the Clare Valley. How much water can be safely extracted without causing depletion of the groundwater resources? This question is being addressed by a major investigation into the groundwater...-
Document
Published: 01 Oct 1998
-
RB 98/00014 Clare Drilling. Phase 2 - June 1997.
Phase Two of a drilling program at Clare, South Australia was undertaken in June, 1997. A total of 6 bores were drilled, 4 of these at existing locations established during Phase One drilling in January, 1996, and a further 2 at Watervale Oval as...-
Document
Published: 01 Mar 1998
-
RB 73/00183 Geological Investigations - Geology of the Little Para Dam - Reservoir area.
Geological mapping shows that the reservoir area consists of Torrensian siltstones, dolomites and quartzites. These are strongly jointed with a pronounced slaty cleavage. The joints form three distinct sets. The geological structure is of uniformly...-
Document