-
NERDDC Project 590 : [ Research into the feasibility of ] Underground gasification of [ mining inaccessible ] Leigh Creek coal. Reports on field investigations and geotechnical studies.
During the first few months of 1985, field investigations were undertaken at Leigh Creek by consultants Golder Associates to provide quantitative data on the strength and permeability characteristics of the geological profile of the Main Series coal...-
Document
-
Rehabilitation of the Nairne Pyrites Ltd quarry area and treatment of acidic effluent. Progress and final reports on investigations for the period March 1973 to June 1975.
A chemical survey of Dawesley Creek in the Brukunga Mine area has concluded that seepages from the southern mine waste dumps located alongside the creek contribute the greater proportion of pollutants (acidity, iron, aluminium, manganese, zinc,...-
Document
-
PACE Discovery Drilling (drilling partnerships with DSD and industry): Year 8 partnership DPY8-14 - Mingary Station, Broken Hill Domain, Palaeoproterozoic lode style stratabound hydrothermal Au-Cu-Ag prospects. Drilling interim and final reports.
During 2014, Minotaur Exploration successfully applied for a PACE 2015 collaborative drilling subsidy grant to help it undertake drill testing of the inferred extension within its current tenement EL 4844 Mingary of the quartzite lode horizon present...-
Document
-
Moorlands. Progress reports and final report to licence full surrender, for the period 15/1/1979 to 30/11/1984.
Adelaide Brighton Cement took up tenure of the Moorlands lignite deposit during September 1976 in order to conduct confirmatory drilling of the published coal resource, to prepare a mining study for Lobe 'E', and overall, to assess the coal's...-
Document
Published: 23 Nov 1984
-
Economic feasibility of producing sulphur from gypsum.
There is no abstract created for this record-
Document
Published: 01 Jan 1969
-
Big Lake 23. Test reports.
There is no abstract created for this record-
Document
-
RB 67/00028;Amdel 599 Extraction of sulphur from gypsum, part 1.
Background: Australia currently imports about 430 000 tons of elemental sulphur per year, valued at about $12,000,000 in 1966. The sulphur is purchased from Canada, the USA and Mexico. The annual production of elemental sulphur in these three...-
Document
Published: 01 Jul 1968
-
RB 26/00118 Gibraltar pyrite deposit near Nairne, SA.
Ideal location - 26 miles from Adelaide - good climate. 3½ miles from Nairne on Adelaide-Melbourne railway line. Electric supply to Nairne-Power requirements could probably be obtained from supply company. Small flow permanent water beside deposit,...-
Document
Published: 15 Nov 1949
-
Thermal processes for sulphur production.
There is no abstract created for this record-
Document
Published: 01 Jan 1969
-
Engineering study sulphur and soda ash from gypsum at Thevenard, SA.
There is no abstract created for this record-
Document
Published: 01 Jan 1970
-
Lake MacDonnell. Progress reports for the period 17/6/1968 to 16/6/1969.
Investigations included studies on production of sulphur, sulphuric acid, and other chemicals from gypsum, a feasibility study on scaled production operations for export of gypsum, and product marketing studies. There are no technical difficulties...-
Document
Published: 14 Dec 1968