Pernatty Quarry. Reports on site investigations for the period September 1986 - March 1989, re. Pernatty Crushing Contract no. 1 [let to McMahon Construction Pty Ltd].
Geoscientific information on quarry materials, copied from former Highways Department files. The subject quarry site was chosen in order to provide crushed rock products for the reconstruction of the Pimba - Wirrappa section of the Stuart Highway....-
Document
Published: 17 Mar 1989
-
[ Report on drilling ] Evaluation of the East Lagoon orebody, Mount Gunson, South Australia.
This report presents the results of ore definition drilling derived from 60 percussion and diamond drill holes put down over the central and southern parts of the East Lagoon orebody, and gives the methodology for calculating currently mineable ore...-
Document
-
Data release [made at SA Director of Mines' discretion] : Mount Gunson (part of the Mount Gunson Project). Annual reports for the period 15/7/1994 to 17/10/2008 [ Index Part 4 of 4 ].
During licence Year 12, following encouraging results made by its continuing exploratory drilling, Gunson Resources was able to negotiate a joint venture over the Mount Gunson Project tenements with Falconbridge Limited through its subsidiary Noranda...-
Document
-
Price. Progress and final reports to licence surrender, for the period 27/4/1977 to 6/12/1978.
Continuation by Aquitaine of its regional appraisal of the mineral potential in the Cambrian carbonate sequence on northern Yorke Peninsula, has recently involved them in acquiring and interpreting ground gravity and magnetic surveys, completing a...-
Document