-
Data release - as updated [made at SA Director of Mines’ discretion] : Paralana Creek (part of the Beverley Project). Annual reports for the period 29/9/2009 to 15/11/2015.
Work undertaken on EL 4378 during the 2009-2010 reporting year included the drilling of 478 vertical rotary mud holes totalling 132,960 m, and core drilling totalling 4117 m performed in 16 of these holes for stratigraphic unit / resource...-
Document
Published: 24 Dec 1915
-
Data release [made at SA Director of Mines’ discretion] : Paralana Creek (part of the Beverley Project). Annual reports and technical reports to licence expiry/renewal, for the period 29/8/1992 to 28/9/2009.
In the reporting period to 30th June 1995 for Exploration Licence 1944, Heathgate Pty Ltd completed no fieldwork, however geological evaluation work was undertaken. This work consisted of laboratory testing of drill core from a 1991 drilling program...-
Document
Published: 18 Jun 1910
-
Data release - as updated [made at SA Director of Mines’ discretion] : Lake Callabonna / Petermorra (part of the Lake Elder Project). Annual reports for the period 19/3/1998 to 30/4/2015.
Exploration Licence 2494 was granted in March 1998 to Paladin Energy Minerals NL and Brightstar Power Corporation Pty Ltd - the Paladin Brightstar Joint Venture (PBJV), with Paladin Resources NL as manager. The target commodity being explored for by...-
Document
Published: 20 May 1915