-
Data release - as updated [made at SA Director of Mines' discretion] : Deception Hill, Lake Everard West, Yellabinna, Cooritta Hill and Lake Everard (the Tunkillia Project). Joint annual reports for the period 1/1/2012 to 31/12/2018.
In 2012, the first year after the project's acquisition, TGL spent A$6.4M on gold exploration and on doing mining feasibility studies. The work program was mainly an ongoing evaluation of development opportunities for the Area 223 gold resource. Some...-
Document
Published: 29 Jan 1919
-
ExpNotes PARACHILNA (v2): Explanatory Notes PARACHILNA (second edition, 1999)
The PARACHILNA map area (31 to 32°S, 138 to 139.5°E) occupies the central Flinders Ranges which are made up of folded, mostly marine sedimentary Neoproterozoic and Cambrian rocks of the Adelaide Geosyncline, and adjoining plains underlain by Cainozoic...-
Document
-
Yalanda East (part of the Eyre Peninsula JV Project). Annual reports and final report to licence surrender, for the period 22/10/2009 to 7/5/2014.
A small licence area composed of three separate sub-blocks, which is centred approximately 80 km south-west of Whyalla, has been explored for possible economic buried base metal and/or gold and/or uranium mineralisation that may have formed in...-
Document
Published: 30 Jul 1914
-
Whiting. First partial surrender report for the period 15/2/2010 to 14/2/2013.
In the vicinity of Weetulta on northern Yorke Peninsula, as part of Minotaur's recent exploration for possible economic buried Moonta or Cloncurry-style IOCG - related base metal massive sulphide mineralisation, 60 line km of airborne VTEM survey data...-
Document
Published: 12 Aug 1913
-
Whiting. Annual reports to licence expiry/full surrender, for the period 15/2/2010 to 14/2/2014.
A number of small, disjoint parcels of available exploration ground in the Moonta-Wallaroo district were taken up by Minotaur early in 2010 to assess their basement IOCG mineralisation potential. A preliminary review done by Minotaur of historic...-
Document
Published: 21 Mar 1914
-
Data release - as updated : Nuckulla Hill, Lake Gairdner and Kondoolka (the Nuckulla Hill Gold Project). Joint annual reports and final report to licences' joint full surrender, for the period 25/8/2009 to 23/3/2018.
The Nuckulla Hill Au-Ag Project, originally consisting of three exploration licences covering 640 square km, is located approximately 115 km north-east of Ceduna in South Australia, and covers approximately 60 km strike length of the mineralised...-
Document
Published: 16 Oct 1917