-
Lake Torrens South, Beda Arm and Carrapateena Arm (latterly the Lake Torrens Joint Venture Project). Annual reports (singular and combined) to licences' respective expiry/renewal, for the period 21/2/1996 to 7/1/2008.
Economic Olympic Dam style iron oxide - associated copper-gold (IOCG) mineralisation has been the target of exploration carried out in three adjoining areas which together extend for about 55 to 170 km north of Port Augusta, covering southern Lake...-
Document
-
RB 2001/00017 TER 001, Yorke Peninsula. Well completion report.
Drillhole TER 1, funded by the TEISA program, was drilled to test basement depth and stratigraphy to the west of Minlaton, Yorke Peninsula. This drilling project followed TEISA aeromagnetic and geological surveys of the Peninsula in 1999, which had...-
Document
Published: 01 Nov 2001