-
The Eyre Peninsula Project, and in part the Corrobinnie Uranium Joint Venture. Joint annual reports for the period 29/12/2008 to 31/12/2013.
During the sixth year of the project, licensee Adelaide Resources did not do any exploration directed at gold or base metals that might possibly occur on the subject tenements. However, its joint venture partner Quasar Resources undertook significant...-
Document
Published: 05 Mar 1914
-
ExpNotes ELLISTON: Explanatory Notes ELLISTON
There is no abstract created for this record-
Document
-
RB 28/00025 Port Lincoln Harbour Boring Project. Progress report.
In order to gather information about the sub-seafloor depth to massive bedrock within Port Lincoln Harbour, needed as part of the process for designing proposed new wharves and ship berthing facilities to be built in the area between Main (Railway)...-
Document
Published: 06 Jul 1950
-
Regolith map of the southern Gawler Ranges margin (300 dpi & 600 dpi pdf formats).
This inaugural regolith map of the southern Gawler Ranges margin provides a valuable regional overview of the main regolith types and their associated landforms, plus a general outline of the major areas of bedrock or regolith-dominated terrain, as...-
Map
Published: 14 Jul 2016
- ZIP