Manunda, Tiverton Outstation, Iron Peak and Pualco Range (the Razorback Ridge Iron Ore Project, later the Mawson Iron Project). Joint annual reports for the period 10/12/2009 to 9/12/2016.
Three adjoining licence areas in the Baratta Trough within the northern Nackara Arc have been taken up to explore for possible economic buried Neoproterozoic metasedimentary semi-stratabound iron ore. Central EL 4267 covers ~3 km strike length of the...-
Document
-
Data release [made at SA Director of Mines' discretion] : Border JV Project. Joint annual reports for the period 1/1/2015 to 31/12/2016.
During the first year of joint reporting for the five licences which are now subject to an amalgamated exploration expenditure agreement, work commenced with the acquisition of 31 line km of ground magnetic survey data over 9 proposed drill sites for...-
Document
-
Mutooroo (latterly part of the Border JV Project). Second partial surrender report at licence expiry/renewal, for the period 16/1/1997 to 18/4/2017.
Four separate large portions of a long-held licence area abutting the SA/NSW state border in the vicinity of Mutooroo have been relinquished as part of statutory requirements. The following summary prepared by Minotaur Exploration describes work done...-
Document
-
Data release - as updated : Mutooroo (part of the Border Project). Annual reports [but excluding three separately held joint annual reports] and final report to licence expiry/full surrender, for the period 3/4/2007 to 18/4/2020.
During licence Year 11 (2007-2008), exploration activities on renewed EL 3745 included: • acquiring 1.9 line km of TEM profiles at Dingo prospect; • acquiring 21.4 line km of ground magnetic survey coverage at 1-metre station spacing on three...-
Document