Data release [made at SA Director of Mines' discretion] : Manunda. Annual reports submitted until the commencement of joint reporting on the Razorback Ridge Iron Ore Project, for the period 10/12/2007 to 9/12/2009.
The banded iron formations associated with various tillite in South Australia have been recognised as being potential sources for iron however the low-grade nature of these bands has been one of the limiting factors in why they have not been...-
Document
-
Data release [made at SA Director of Mines’ discretion] : Iron Peak. Annual reports and final report to licence expiry/renewal, for the period 12/11/2003 to 11/11/2008.
The banded iron formations associated with various Neoproterozoic tillites in South Australia have for some time been recognised as being potential sources for iron ore, however, the low grade nature of the iron mineralisation within these bands has...-
Document
Published: 01 Jan 2009
-
Olary (part of the Braemar Iron Project). Annual reports to licence expiry/cancellation, for the period 20/9/2010 to 19/9/2015.
A licence area in the Olary district comprising three separate sub-blocks has been explored for possible economic stratabound iron ore occurrences within partly concealed Neoproterozoic bedrock. The subject ground was taken up by Wentworth Metals...-
Document
-
Manunda, Tiverton Outstation, Iron Peak and Pualco Range (the Razorback Ridge Iron Ore Project, later the Mawson Iron Project). Joint annual reports for the period 10/12/2009 to 9/12/2016.
Three adjoining licence areas in the Baratta Trough within the northern Nackara Arc have been taken up to explore for possible economic buried Neoproterozoic metasedimentary semi-stratabound iron ore. Central EL 4267 covers ~3 km strike length of the...-
Document
-
Mutooroo (latterly part of the Border JV Project). Second partial surrender report at licence expiry/renewal, for the period 16/1/1997 to 18/4/2017.
Four separate large portions of a long-held licence area abutting the SA/NSW state border in the vicinity of Mutooroo have been relinquished as part of statutory requirements. The following summary prepared by Minotaur Exploration describes work done...-
Document
-
Data release - as updated : Mutooroo (part of the Border Project). Annual reports [but excluding three separately held joint annual reports] and final report to licence expiry/full surrender, for the period 3/4/2007 to 18/4/2020.
During licence Year 11 (2007-2008), exploration activities on renewed EL 3745 included: • acquiring 1.9 line km of TEM profiles at Dingo prospect; • acquiring 21.4 line km of ground magnetic survey coverage at 1-metre station spacing on three...-
Document
-
Data release [made at SA Director of Mines’ discretion] : Tiverton Outstation. Annual reports submitted until the commencement of joint reporting on the Razorback Ridge Iron Ore Project, for the period 17/9/2007 to 16/9/2009.
The banded iron formations associated with various tillite in South Australia have been recognised as being potential sources for iron however the low-grade nature of these bands has been one of the limiting factors in why they have not been...-
Document