Moorlands. Progress reports and final report to licence full surrender, for the period 15/1/1979 to 30/11/1984.
Adelaide Brighton Cement took up tenure of the Moorlands lignite deposit during September 1976 in order to conduct confirmatory drilling of the published coal resource, to prepare a mining study for Lobe 'E', and overall, to assess the coal's...-
Document
Published: 23 Nov 1984
-
Tintinara. Progress reports and final report to licence expiry/full surrender, for the period 8/1/1979 to 7/1/1980.
Exploration for possible economic Tertiary lignite and coal seams within sediments overlying the northern flank of the Padthaway Ridge palaeo-archipelago in the western Murray Basin has consisted of the drilling and geological/geophysical logging of 7...-
Document