-
Woomera and Wirrappa. Annual reports and first joint annual report, plus final report to licences' joint full surrender, for the period 14/1/2013 to 13/11/2018.
Two adjacent areas located immediately south and east of Woomera township were taken up to search for possible buried economic stratabound deposits of copper or other metals that may have formed in the Neoproterozoic and Mesoproterozoic cover sequence...-
Document
Published: 07 Jan 1919
-
Geology of the Cattlegrid mine, [March] 1972 - [December] 1982.
This report is intended to be a convenient single reference to the Cattlegrid ore deposit geology. It represents an updated summary of a large amount of data, gleaned largely from internal company reports. The subject matter relates mainly to the...-
Document
-
Pernatty Lagoon. Progress reports and final report to licence expiry/renewal, for the period 20/7/1975 to 19/7/1977.
As part of continuing brownfields exploration for extensions to known stratiform base metal mineralisation in the area lying to the west of Pernatty Lagoon, much stratigraphic drilling (210 rotary percussion holes totalling 12,441 m, including 1167 m...-
Document
-
Yalymboo, Dingo Hill and Black Oak Hill (the Cariewerloo Project). Joint annual reports and separate final reports to licence's respective expiry/full surrender, for the period 5/6/2006 to 20/6/2009.
Possible Mesoproterozoic unconformity-related uranium deposits within the Cariewerloo Basin, involving an inferred structural preparation component whereby basic intrusive members of the Gairdner Dyke Swarm cut across this unconformity in a manner...-
Document
Published: 19 Nov 1909
-
RB 2016/00014 Geology of the Six Mile Hill 1:75 000 Special Edition Map Sheet.
The Six Mile Hill 1:75 000 Map Sheet was produced as part of a mapping program integrated into the Mineral Systems Drilling Program (MSDP) along the southern margin of the Gawler Ranges. The objective of the mapping program was to provide a regional...-
Document
Published: 01 Dec 2016
-
Mount Gunson and Pernatty Lagoon. Joint annual report to licences' expiry/renewal, for the period 1/12/1965 to 30/11/1966.
During January and April 1966, 10,611 feet of reconnaissance and infill percussion drilling plus 300 feet of auger drilling were carried out on SML 96, around the former Main Open Cut and Lagoon workings of the historic Mount Gunson copper mine, with...-
Document
Published: 30 Nov 1966