-
Mount Carulina and Trapeze Hill (the Oodnadatta Project). Joint annual reports plus succeeding single licence annual reports to licence expiry/full surrender, for the period 6/3/1995 to 12/10/2009. [ Index Part 2 of 2 ].
[ Note - here is Part 2 of the abstract relating to 2 separately indexed parts ]. A new joint venture with Barrick Gold, pertaining to the renewed (as EL 3424) tenement, was signed on 8/2/2007, after which that company as operator undertook a 749...-
Document
Published: 09 Feb 2010
-
Coober Pedy Project. Annual reports, joint annual reports, and final reports at individual licences' full surrender, for the period 4/4/2011 to 3/4/2015.
Five separate areas located in the northern Gawler Craton adjacent to the Mount Woods Domain, which to date have received only minor attention from mineral explorers and so have had limited drilling done, have been explored for possible buried...-
Document
Published: 15 Apr 2015
-
Warramboo area. Annual reports and final report to licence expiry/full surrender, for the period 29/11/1993 to 28/11/1995.
Cu-Au and iron ore exploration, undertaken over ground situated 10-15 km south and east of Kyancutta, comprised the acquisition of an airborne magnetic/radiometric survey and ground gravity, ground magnetic and IP surveys, followed by RC drilling of 5...-
Document
Published: 20 Nov 1995
-
Mentor Outstation. Annual reports to licence expiry/full surrender, for the period 29/9/2003 to 28/9/2008.
A tenement comprising five separate areas in the central Gawler Craton, situated on either side of the Bulgunnia Shear Zone at locations ranging between 20 and 55 km north of Tarcoola, was taken up to explore for possible iron oxide - associated...-
Document
-
Mount Irwin. First and final report for the period 3/4/95 to 2/4/96.
Results of reconnaissance geochemical sampling of outcrop and lag gravels of ?Birksgate Complex ferruginous quartzites within the eastern Musgrave Block did not justify further exploration for potential Broken Hill-style exhalative Pb-Zn-Ag deposits.-
Document
-
......[Key SAMREF record for accessing referenced reports and data via DEM Content Manager - SPOT]...... Kartanya. Annual reports and final report to licence expiry/full surrender, for the period 6/3/1995 to 5/3/1999.
Previous drilling by WMC at the Kartanya prospect, 30 km west of Rudall in the central-southern Eyre Peninsula, yielded several high grade Fe intersections with up to 1% P and 140 ppm Zn. Reassaying of drillhole samples returned reduced levels of...-
Document
-
Meningie. Final report at licence full surrender, for the period 27/4/1995 to 16/4/1996.
Gold and base metal exploration undertaken in an area extending to the north and south-east of Meningie comprised image interpretation of SAEI aeromagnetic data, plus the conduct of ground magnetic surveys over and then test RC / diamond drilling of 6...-
Document
Published: 08 Dec 1995
-
Bookabie. First partial surrender report, for the period 26/8/1994 to 25/8/1995.
Exploration for base and precious metals within an area 40-60 km north-west of Penong, now relinquished from the EL, comprised 5 km of ground magnetic surveys and aircore drilling of 4 resulting magnetic features (13 holes, total 626 m). The drilling...-
Document
-
Mount Glyde. Annual reports and and final report to licence full surrender, for the period 20/11/1992 to 7/8/1995.
Exploration for Olympic Dam and Acropolis - style base and precious metals mineralization, north of Lake Acraman, comprised initial interpretation of SAEI aeromagnetic data plus the conduct of gravity, surface geochemical, ground magnetic, IP and...-
Document
-
Watson Siding - Ooldea area. Progress reports and final report to licence expiry/renewal, for the period 17/4/1980 to 16/4/1982.
Interpretation of available SADME/BMR airborne magnetic survey data, and subsequent ground magnetic and gravity surveys to define five targets, were conducted in the area between Watson Siding and Ooldea, prior to drilling two rotary percussion holes...-
Document
Published: 20 Jul 1982
-
Lake Gilles. First partial surrender report, for the period 15/11/1993 to 14/11/1995.
While searching for Menninnie Dam type Pb-Zn deposits a ground magnetic survey was carried out over a linear magnetic feature in the Red Dam area, south-east of Lake Gilles. RC drilling (four holes, total 349 m) intersected weakly elevated Pb/Zn, and...-
Document
Published: 12 Dec 1996
-
Green Patch. Annual reports for the period 3/12/2001 to 30/5/2006, plus the last six years of tenure' combined annual reports/final report ('no work' letter only) to licence expiry/full surrender, for the period 1/2/2015 to 31/8/2021.
An area centred on the hamlet of Green Patch, located ~10 km north-west of Port Lincoln, was taken up to appraise the iron ore potential of known near surface BIF magnetite mineralisation occurring at the Greenpatch (sic) prospect that had been...-
Document
Published: 16 Oct 2021
-
Mount Christie [part of the Barton Project]. Annual reports and final report to licence expiry/full surrender, for the period 5/6/1995 to 4/6/2000.
Calcrete sampling over aeromagnetic targets within the Fowler Shear Zone was undertaken, to locate evidence of possible Cu-Au mineralisation developed during emplacement of Hiltaba Suite granites south and south-west of Wynbring. Weakly anomalous Au...-
Document
Published: 16 Aug 2000
-
Unlocking South Australia's Mineral and Energy Potential - A Plan for Accelerating Exploration. Theme 2 (drilling partnerships with PIRSA and industry) : Year 2 partnership no. DPY2-41, Coolybring magnetite prospect. Project final report.
EL 3089 licensee Stellar Resources Ltd was granted SA Government PACE Initiative Year 2 funding for a drillhole programme to test the source of the intense Coolybring magnetic anomaly situated 9 km north-east of Tarcoola, which is inferred to be a...-
Document
Published: 11 Nov 2005
-
Mount Ogilvie. Technical, annual and final reports to licence expiry for the period 14/2/97 to 22/5/2003.
Photo lineament analysis of an area centred on Mount Ogilvie, 30 km north-east of Leigh Creek, identified several targets considered to be potentially prospective for mineralisation. During a brief field visit seeking work clearance from native title...-
Document
Published: 23 Jul 2003
-
Pinerow. Annual and final reports to licence expiry/full surrender for the period 2/10/2004 to 9/11/2008.
To continue the assessment of the dimension stone and ornamental stone potential of granitic basement outcrops present on EL 2851, a 5-year Retention Lease, RL 116, was taken out on 7/2/2006 to cover 5.9 ha of the Middle Camp granite pluton. Several...-
Document
Published: 08 Jan 2009
-
Data release [made at SA Director of Mines’ discretion] : Hawks Nest. Annual reports to licence expiry/renewal, for the period 12/3/1999 to 11/3/2004.
An area comprising two separate sub-blocks centred ~115 km south-southeast of Coober Pedy and located to the west of the Stuart Highway is being explored for Archaean to Palaeoproterozoic banded iron formation iron ore mineralisation of economic...-
Document
Published: 05 Feb 2004
-
Morialpa. Data release made in lieu of submitting a first partial surrender report : progress reports and annual reports for the period 16/12/1995 to 8/8/2003.
Initial exploration for stratiform Cu-Au mineralisation hosted within Adelaidean sediments in the Morialpa area, 40 km north- west of Olary, comprised soil, stream sediment, rock chip and ironstone lag geochemical sampling, and 1:10,000 scale...-
Document
Published: 29 Aug 2003
-
Data release - as updated [made at SA Director of Mines’ discretion] : Warramboo (the Central Eyre Project). Annual reports [but excluding four separately held joint annual reports] for the period 6/6/2001 to 8/2/2019.
During the sixth year of tenure of the Warramboo licence, now held by Adelaide Exploration Limited as renewed EL 2846 covering the same 1363 square km area as before, the only exploration-related activity which occurred was the acquisition during...-
Document
Published: 28 Mar 2018
-
Data release - as updated [made at SA Director of Mines' discretion] : Cutana. Annual reports for the period 25/7/2007 to 15/8/2013, and the "Curnamona South Project" annual report for the period 1/1/2017 to 31/12/2018.
During licence year 6, the commencing year of renewed EL 3895 Cutana, no work took place because Havilah's RC drilling rig, along with all company personnel, were fully occupied on completing the mining feasibility evaluation drilling programmes...-
Document
Published: 15 Apr 2019