Mutooroo (latterly part of the Border JV Project). Second partial surrender report at licence expiry/renewal, for the period 16/1/1997 to 18/4/2017.
Four separate large portions of a long-held licence area abutting the SA/NSW state border in the vicinity of Mutooroo have been relinquished as part of statutory requirements. The following summary prepared by Minotaur Exploration describes work done...-
Document
-
Data release - as updated : Mutooroo (part of the Border Project). Annual reports [but excluding three separately held joint annual reports] and final report to licence expiry/full surrender, for the period 3/4/2007 to 18/4/2020.
During licence Year 11 (2007-2008), exploration activities on renewed EL 3745 included: • acquiring 1.9 line km of TEM profiles at Dingo prospect; • acquiring 21.4 line km of ground magnetic survey coverage at 1-metre station spacing on three...-