-
Rehabilitation of the Nairne Pyrites Ltd quarry area and treatment of acidic effluent. Progress and final reports on investigations for the period March 1973 to June 1975.
A chemical survey of Dawesley Creek in the Brukunga Mine area has concluded that seepages from the southern mine waste dumps located alongside the creek contribute the greater proportion of pollutants (acidity, iron, aluminium, manganese, zinc,...-
Document
-
RB 2000/00019 Dawesley Bremer Catchment, phase 2 sampling program for potential environmental contaminants.
A previous regional soil and stream sediment sampling program (cf. RB 2000/00002) has delineated areas of heavy metal contamination in the Dawesley-Bremer Catchment. Heavy metal contamination was found to occur sporadically along both Dawesley Creek...-
Document
Published: 01 May 2000