-
Streaky Bay. Progress reports and final report to licence expiry/ full surrender, for the period 2/11/1987 to 1/11/1989.
TARGET: Gypsum in dune and salt lake deposits; groundwater for possible water supply. EXPLORATION: Auger drilling of aeolian dunes and 7 salt lakes, reverse circulation drilling (16 holes totalling 410 m) for water. RESULTS: A resource of 4 Mt @ 88%...-
Document
Published: 03 Oct 1990