RB 98/00014 Clare Drilling. Phase 2 - June 1997.
Phase Two of a drilling program at Clare, South Australia was undertaken in June, 1997. A total of 6 bores were drilled, 4 of these at existing locations established during Phase One drilling in January, 1996, and a further 2 at Watervale Oval as...-
Document
Published: 01 Mar 1998
-
Willouran Ranges (part of the SAMAG Project). Annual reports and final report to licence expiry/full surrender, for the period 19/11/1998 to 18/11/2003.
Known magnesite beds existing within the Adelaidean Skillogalee Dolomite in the far north-western Flinders Ranges, and extending into the Willouran Ranges over a strike distance of 120 km heading north-westwards from Leigh Creek South township, have...-
Document
-
RB 2008/00016 Review of the Burra Mine Project, 1980-2008 - a progress report.
The Burra (Burra) Mine, situated 150 km north of Adelaide within the Adelaide Geosyncline, produced 2.7 million tonnes of copper ore in two major mining phases - 1845-1877 and 1970-1981. The first phase was initially progressed by underground...-
Document
Published: 01 Jan 2009