-
RB 51/00017 Diamond drilling, Prince Alfred copper mine.
Sediments in the area consist of blue dolomitic flaggy and laminated slates and grits, and are equated with the Sturtian Series of the Adelaide System. Copper lodes occur parallel to the beds, which dip between 50-70°W. During the period March to July...-
Document
Published: 08 Aug 1960
-
Data release [made at SA Director of Mines' discretion] : Manunda. Annual reports submitted until the commencement of joint reporting on the Razorback Ridge Iron Ore Project, for the period 10/12/2007 to 9/12/2009.
The banded iron formations associated with various tillite in South Australia have been recognised as being potential sources for iron however the low-grade nature of these bands has been one of the limiting factors in why they have not been...-
Document
-
Data release [made at SA Director of Mines’ discretion] : Iron Peak. Annual reports and final report to licence expiry/renewal, for the period 12/11/2003 to 11/11/2008.
The banded iron formations associated with various Neoproterozoic tillites in South Australia have for some time been recognised as being potential sources for iron ore, however, the low grade nature of the iron mineralisation within these bands has...-
Document
Published: 01 Jan 2009
-
Data release - as updated [made at SA Director of Mines' discretion] : Braemar. Annual reports plus third partial surrender report to licence expiry/renewal, for the period 10/12/2007 to 9/12/2018.
The subject EL 3998 Braemar, in its eastern part, covers a 20 km long, high amplitude aeromagnetic anomaly located within the northern part of the Adelaide Fold Belt, that overlies a large antiformal fold in the Adelaidean metasedimentary cover which...-
Document
-
Manunda, Tiverton Outstation, Iron Peak and Pualco Range (the Razorback Ridge Iron Ore Project, later the Mawson Iron Project). Joint annual reports for the period 10/12/2009 to 9/12/2016.
Three adjoining licence areas in the Baratta Trough within the northern Nackara Arc have been taken up to explore for possible economic buried Neoproterozoic metasedimentary semi-stratabound iron ore. Central EL 4267 covers ~3 km strike length of the...-
Document
-
Stuart Creek. Progress reports and final report to licence expiry/full surrender, for the period 20/8/1979 to 18/10/1982.
One vertical stratigraphic diamond drillhole [the 1a re-drill] was fully cored to 1450 m total depth over a regional gravity high in the western half of the licence which was thought to be prospective for Olympic Dam type polymetallic mineralisation...-
Document
-
RB_83/00107 Geological Society of Australia Abstracts No.10, Adelaide Geosyncline, Sedimentary Environments and Tectonic Settings, Symposium A.M.F. Adelaide Dec 9, 1983
There is no abstract created for this record-
Document
Published: 01 Dec 1983
-
RB 70/00174 Correlations between Adelaide system rocks in South Australia and near Broken Hill, NSW.
There is no abstract created for this record-
Document
Published: 01 Jan 1970
-
RB 73/00126 International Union of Geological Sciences, Subcommission on Precambrian Stratigraphy. Notes for excursions in South Australia 1973.
Brief geological information is given for points to be visited over eight days as illustration of the Adelaide System in South Australia, with an emphasis on Adelaidean glacigene rocks. The Callanna Beds are seen in the Arkaroola region, the Aldgate...-
Document
Published: 01 Jan 1973
-
Data release [made at SA Director of Mines’ discretion] : Tiverton Outstation. Annual reports submitted until the commencement of joint reporting on the Razorback Ridge Iron Ore Project, for the period 17/9/2007 to 16/9/2009.
The banded iron formations associated with various tillite in South Australia have been recognised as being potential sources for iron however the low-grade nature of these bands has been one of the limiting factors in why they have not been...-
Document
-
RB 2014/00006 Geology of the Cultana 1:100 000 map sheet (6432).
The revised digital geology map of the Cultana 1:100 000 map sheet and accompanying geological descriptions in this report are the first components of the 2nd edition PORT AUGUSTA 1:250 000 map sheet to be completed. The subject map sheet occupies the...-
Document
Published: 01 Jan 2014
-
Prince Alfred mine. Second partial surrender report, for the period 9/4/1998 to 8/10/1999.
Areas near the Prince Alfred mine, located approximately 70 km north of Orroroo, were relinquished on the basis of them having either a non-prospective mineral association or too low values of trace metal geochemistry. Anomalous copper and traces of...-
Document
Published: 15 Nov 1999
-
Scott Hill. Progress reports and final report to licence expiry/full surrender, for the period 18/3/1982 to 17/3/1983.
In a search for possible concealed Olympic Dam type deposits in an area of the Adelaide Geosyncline which straddles part of the south-western margin of the Curnamona Province, two geophysical (gravity/magnetic) targets identified at Bibliando Dome and...-
Document
-
Mount Burr. Progress and final reports to licence surrender, for the period 15/10/1970 to 14/7/1971.
A small area of the northern Flinders Ranges surrounding the Nichols Nob copper occurrences was explored for possible economic massive stratiform copper deposits, targeting the known mineralised Yudnamutana Subgroup metasediments. Work comprised a...-
Document