-
AMCOR Lateral Pipeline - Statement of Environmental Objectives - Archived.
Section 12 of the Petroleum and Geothermal Energy Regulations 2013 require any person proposing to undertake activities relevant to petroleum exploration to prepare a draft Statement of Environmental Objectives (SEO) prior to exploration commencing....-
Document
Published: 01 Feb 2001
-
South Australia Cooper Basin Operators Production and Processing Operations - Statement of Environmental Objectives - Archived.
Section 12 of the Petroleum and Geothermal Energy Regulations 2013 require any person proposing to undertake activities relevant to petroleum exploration to prepare a draft Statement of Environmental Objectives (SEO) prior to exploration commencing....-
Document
Published: 01 Nov 2003
-
Stuart Petroleum Cooper Basin Petroleum Production Operations (Dunefield and Floodplain) - Environmental Impact Report - Archived.
Section 10 of the Petroleum and Geothermal Energy Regulations 2013 require a licensee to prepare an Environmental Impact Report (EIR) detailing the environment of the area included in the scope. An EIR must identify any events associated with the...-
Document
Published: 01 Aug 2008
-
Proposed Production Test by Stuart Petroleum at Acrasia #1 - Environmental Impact Report - Archived.
Section 10 of the Petroleum and Geothermal Energy Regulations 2013 require a licensee to prepare an Environmental Impact Report (EIR) detailing the environment of the area included in the scope. An EIR must identify any events associated with the...-
Document
Published: 01 Jun 2002
-
Victoria Petroleum Cooper Basin Petroleum Production Operations - Environmental Impact Report - Archived.
Section 10 of the Petroleum and Geothermal Energy Regulations 2013 require a licensee to prepare an Environmental Impact Report (EIR) detailing the environment of the area included in the scope. An EIR must identify any events associated with the...-
Document
Published: 01 Sep 2008
-
Geophysical Operations in the Arckaringa Basin - Environmental Impact Report - Archived.
Section 10 of the Petroleum and Geothermal Energy Regulations 2013 require a licensee to prepare an Environmental Impact Report (EIR) detailing the environment of the area included in the scope. An EIR must identify any events associated with the...-
Document
Published: 01 Oct 2007
-
Jena Waterflood Pilot Project - Environmental Impact Report - Archived.
Section 10 of the Petroleum and Geothermal Energy Regulations 2013 require a licensee to prepare an Environmental Impact Report (EIR) detailing the environment of the area included in the scope. An EIR must identify any events associated with the...-
Document
Published: 16 Jan 2003
-
Gravestock 1 - Environmental Impact Report - Archived.
Section 10 of the Petroleum and Geothermal Energy Regulations 2013 require a licensee to prepare an Environmental Impact Report (EIR) detailing the environment of the area included in the scope. An EIR must identify any events associated with the...-
Document
Published: 01 Sep 2006
-
South Australian Cooper Basin Drilling, Completions and Well Operations - Environmental Significance Assessment. November 2015. Archived.
Section 98 of the Petroleum and Geothermal Energy Act 2000 require the minister to classify the activities to which an Environmental Impact Report (EIR) relates as either low, medium or high impact activities. This forms the basis of an Environmental...-
Document
Published: 19 Nov 2015
-
QSN Link Pipeline - Statement of Environmental Objectives. March 2008. Archived.
Section 12 of the Petroleum and Geothermal Energy Regulations 2013 require any person proposing to undertake activities relevant to petroleum exploration to prepare a draft Statement of Environmental Objectives (SEO) prior to exploration commencing....-
Document
Published: 01 Mar 2008
-
PL 06 Angaston to Berri Transmission Pipeline and Murray Bridge Lateral Pipeline (Riverland) - Environmetnal Statement of Objectives - Archived.
Section 12 of the Petroleum and Geothermal Energy Regulations 2013 require any person proposing to undertake activities relevant to petroleum exploration to prepare a draft Statement of Environmental Objectives (SEO) prior to exploration commencing....-
Document
Published: 24 Jan 2014
-
Beach Petroleum Cooper Basin Petroleum Production Operations - Statement of Environmental Objectives. Archived.
Section 12 of the Petroleum and Geothermal Energy Regulations 2013 require any person proposing to undertake activities relevant to petroleum exploration to prepare a draft Statement of Environmental Objectives (SEO) prior to exploration commencing....-
Document
Published: 30 Nov 2009
-
Drilling Activities in PELs 81 and 253 - Officer Basin - Statement of Environmental Objectives - Archived.
Section 12 of the Petroleum and Geothermal Energy Regulations 2013 require any person proposing to undertake activities relevant to petroleum exploration to prepare a draft Statement of Environmental Objectives (SEO) prior to exploration commencing....-
Document
Published: 30 Sep 2010
-
PL 03 and 04 South East Pipeline System - Statement of Environmental Objectives. Archived.
Section 12 of the Petroleum and Geothermal Energy Regulations 2013 require any person proposing to undertake activities relevant to petroleum exploration to prepare a draft Statement of Environmental Objectives (SEO) prior to exploration commencing....-
Document
Published: 31 Oct 2009
-
Beach Energy Cooper Basin petroleum production operations - environmental impact report. January 2024.
Section 10 of the Petroleum and Geothermal Energy Regulations 2013 require a licensee to prepare an Environmental Impact Report (EIR) detailing the environment of the area included in the scope of the proposed activity. An EIR must identify any events...-
Document
Published: 10 Jan 2024
-
PEL 687 Natural hydrogen exploration drilling and well testing - environmental impact report. August 2023.
Gold Hydrogen Ltd is exploring for natural hydrogen over Petroleum Exploration Licence (PEL) 687, which covers large sections of Yorke Peninsula and Kangaroo Island. As a replacement for carbon-based fuels, naturally occurring hydrogen (also known as...-
Document
Published: 21 Sep 2023
-
Beach Energy Cooper Basin petroleum production operations - statement of environmental objectives. January 2024.
Section 12 of the Petroleum and Geothermal Energy Regulations 2013 require any person proposing to undertake activities relevant to petroleum production to prepare a draft Statement of Environmental Objectives (SEO) prior to production operations...-
Document
Published: 10 Jan 2024
-
PL 06 & 11 Riverland Pipeline & Berri to Mildura Pipeline - environmental impact classification. July 2024.
Section 98 of the Petroleum and Geothermal Energy Act 2000 requires the Minister to classify the activities to which an environmental impact report relates as either low, medium or high impact activities. This document summarises the classification...-
Document
Published: 16 Jul 2024
-
PL 06 & 11 Riverland Pipeline & Berri to Mildura Pipeline - environmental impact report. February 2024.
This environmental impact report has been prepared to satisfy the requirements of the Petroleum and Geothermal Energy Act 2000 (SA) with regard to the operation of the Riverland Pipeline and the South Australian section of the Berri to Mildura...-
Document
Published: 01 Feb 2024
-
Northern St Vincent and Walloway Basins, exploratory coal seam drilling, PEL 120 - government consultation. 2008. Archived.
There is no abstract created for this record-
Document
Published: 01 Jan 2008