-
RB 91/00041 Geology of the KINGOONYA 1:250 000 map sheet area.
Extensive field geological mapping, augmented by petrological and geochemical studies, reinterpretation of company drilling and water-bore logs and a nine-hole drilling programme has detailed the geology of the KINGOONYA area. The stratigraphy spans...-
Document
Published: 01 Apr 1991
-
RB 90/00065 Explanatory Notes for the STREAKY BAY 1:250 000 sheet.
There is no abstract created for this record-
Document
Published: 01 Oct 1990
-
RB 96/00016 Review of mineral exploration - CHILDARA region.
Mineral exploration on CHILDARA 1:250 000 geological map sheet was reviewed from SADME open file Envelopes, to complement an overview of regional prospectivity supported via the recent acquisition of high quality aeromagnetic data and a compilation by...-
Document
Published: 01 May 1996
-
South Vivian [Homestead]. Annual reports and final report to licence expiry/full surrender, for the period 12/6/2007 to 11/6/2009.
An area located on the northern Stuart Shelf between Olympic Dam and Prominent Hill, approx. 50 km south-southwest of the latter, has been explored for possible Olympic Dam type iron oxide - associated copper-gold (IOCG) deposits and for Canadian...-
Document
Published: 17 Oct 1909
-
Carnding. Data release made in lieu of submitting a second partial relinquishment report at licence expiry/renewal : progress reports and annual reports for the period 29/9/1994 to 16/1/2005.
Renewed brownfields gold exploration in an area situated 20-40 km north and west of the Tarcoola Goldfield, previously held in part by the licensee as EL 1848, was prompted by the May 1995 success of the Samantha/Resolute/Dominion corporate joint...-
Document
Published: 28 Jul 1905
-
Botenella Range (now part of the Wilcherry Hill JV Project). Progress, annual and final reports to the commencement of the project licences' combined reporting status, for the period 14/2/1991 to 18/9/2002.
Exploration of an area lying west of Lake Gilles concentrated initially on assessing its potential for hosting syngenetic Palaeoproterozoic stratiform base metal deposits along perceived stratigraphic extensions of the beds containing the recently...-
Document
Published: 16 Oct 1903
-
PACE Theme 2 (drilling partnerships with PIRSA and industry): Year 1 partnership DPY1-46, western Gawler Range Volcanic Province mineral prospects. Project interim and final reports.
An area of the Gawler Range Volcanic Province that straddles the southern portion of the Yarlbrinda Shear Zone, 80 km south of Kingoonya, and which contains mylonitised and sericite-altered Palaeoroterozoic intrusive rocks, was the target for three...-
Document
-
PACE Theme 2 (drilling partnerships with PIRSA and industry): Year 3 partnership DPY3-38, Central Gawler Gold Province, Barns West and Baggy Green North gold prospects. [8 x RC drillholes] Project final report.
PACE Initiative Year 3 drilling project funds were secured by Adelaide Resources to evaluate a number of previously detected IP anomalies inferred to originate from sources in the Mesoproterozoic basement and saprolitic cover in the vicinity of the...-
Document
-
Unlocking South Australia's Mineral and Energy Potential - A Plan for Accelerating Exploration. Theme 2 (drilling partnerships with PIRSA and industry) : Year 2 partnership no. DPY2-40, Soyuz gold / copper-gold mineral prospect. Project final report.
Previous exploratory work by Grenfell Resources and Gravity Capital at the Soyuz prospect in the Carnding area, located approximately 25 km west-northwest of Tarcoola, has included ground magnetic, gravity and soil sampling programmes that defined a...-
Document
Published: 15 Jun 1906
-
PACE Theme 2 (drilling partnerships with PIRSA and industry): Year 2 partnership DPY2-45, Old Well and New Well shear-associated gold mineral prospects. Project final report.
The Yarlbrinda and Yerda Shear Zones of the central Gawler Craton, partly present within EL 3107 in the Tarcoola-Glenloth-Lake Harris region, were the target for a number of mineral exploratory drillholes put down there by by licence farminee Minotaur...-
Document
-
PACE Theme 2 (drilling partnerships with PIRSA and industry): Year 3 partnership DPY3-46, Coober Pedy Ridge southern margin (Robin Rise Project) IOCG mineral prospects. Project final report.
The approved PACE Initiative Theme 2 drilling proposal DPY3-46 was specifically designed to test for haematite-dominant iron oxide - associated copper-gold (IOCG) mineralisation in an area of the northern Gawler Craton where little past exploration...-
Document
Published: 07 May 1907
-
Unlocking South Australia's Mineral and Energy Potential - A Plan for Accelerating Exploration. Theme 2 (drilling partnerships with PIRSA and industry) : Year 4 partnership no. DPY4-65, Chianti mineral prospect. Project completion dataset.
The subject set of reports describes the results of PACE Initiative Year 4 partly-subsidised drilling work conducted in the vicinity of the Chianti prospect, which lies approx. 20 km north of the old Mount Gunson mining camp. The aim of this work,...-
Document
-
PACE Theme 2 (drilling partnerships with PIRSA and industry): Year 3 partnership DPY3-57, Streaky Bay area gravity highs and lows - IOCG and sedimentary uranium mineral prospects. Project final report.
As part of the PACE Initiative Year 3 subsidised drilling programmes, Minotaur Exploration proposed exploring a large tenement package in the Streaky Bay area simultaneously for Prominent Hill style iron oxide copper gold (IOCG) and palaeochannel...-
Document
-
Andamooka Creek, Willaroo Dam, Island Dam and Stuart Shelf / Andamooka Ranges (the Stuart Shelf Project). Joint annual reports on activities undertaken by the Joint Venture consortium, for the period 11/10/1996 to 10/10/2009 [ Index Part 2 of 2 ].
As a result of the BHP Billiton takeover of the Stuart Range Project, the mineral exploration strategy was changed. Formerly, WMC had been looking for economical targets of >500 Mt size containing on average more than 2.4% copper equivalent....-
Document
-
Data release [made at SA Director of Mines' discretion] : Mullaquana. Annual reports for the period 20/11/2006 to 19/11/2009.
A tenement area located close to and along the eastern seaboard of the Eyre Peninsula, and which extends from Whyalla southwards for approximately 60 km, has been taken up to explore for possible economic buried primary, hard rock hosted uranium and...-
Document
Published: 20 Jun 1910
-
Cedric Bore. Annual reports plus final report to licence expiry/full surrender, for the period 2/4/2002 to 17/6/2008.
An area centred ~ 80 km north of Tarcoola was taken under licence to explore for possible economic buried precious and base metallic mineralisation hosted by Archaean and Proterozoic basement rocks. The area was selected on the basis of it having...-
Document
Published: 16 Sep 1908
-
Data release - as updated [made at SA Director of Mines’ discretion] : Tarcoola. Annual reports for the period 2/6/2008 to 29/7/2018.
During the first year of renewed EL 4167, in October and November 2008, Stellar Resources Ltd ("Stellar") completed a 5 hole, 1286.9 m RC and 2 hole, 157.1 m diamond cored inclined drilling programme at the Coolybring prospect which is located...-
Document
Published: 11 Sep 1918
-
Data release [made at SA Director of Mines' discretion] : Bulgunnia (part of the Gawler JV Project). Annual reports for the period 19/11/1997 to 1/1/2013.
Within an area of the Wilgena and Christie Domains centred 40 km north of Tarcoola, exploration is continuing for Archaean to Proterozoic basement-hosted epithermal, hydrothermal and metamorphic type gold and base metal occurrences. Here an 841 square...-
Document
-
ELs 4653 - 4661 (the Marla Project). Joint annual reports, plus final reports at licences' individual or joint full surrenders, for the period 25/1/2011 to 9/9/2014.
Nine licence areas occupying a 70 km x 30 km region overlying a west-northwest trending structural corridor situated along the northern margin of the Gawler Craton, have been explored for possible buried large-scale deposits of iron oxide - associated...-
Document
Published: 23 Oct 1914
-
Mount Arden (part of the Six Mile Hill Project). First annual report, plus second annual/final report to licence expiry/full surrender, for the period 13/10/2014 to 12/10/2016.
An irregular area covering pastoral land ~15 km to the immediate west and north-west of Port Augusta has been explored for possible economic buried IOCG and other significant metallic mineralisation, which could have formed in the vicinity of the...-
Document