West Lake Torrens (part of the Murdie Project). Final report for geophysical, drilling and logistics program, Project ADI RD01-120 [part of Accelerated Discovery Initiative Round 1, 2021].
ADI funding was granted by DEM to Kelaray to conduct approved geophysical surveys and exploratory drilling and apply logistical support within its Murdie Project, for a combined expenditure of up to A$320,000. At the outset of the project, Kelaray...-
Document
-
Olympic Dam operations. Environmental management programme annual report. 01/03/90 - 28/02/91.
Reports on monitoring of: - air and solid waste pollution; - drill pad rehabilitation; - meteorology, vegetation, flora, fauna and soil salinity; - mine ground water drainage; - artesian water drawdown at Wellfield A in the Great Artesian Basin;...-
Document
-
RB 2016/00014 Geology of the Six Mile Hill 1:75 000 Special Edition Map Sheet.
The Six Mile Hill 1:75 000 Map Sheet was produced as part of a mapping program integrated into the Mineral Systems Drilling Program (MSDP) along the southern margin of the Gawler Ranges. The objective of the mapping program was to provide a regional...-
Document
Published: 01 Dec 2016
-
RB 2014/00006 Geology of the Cultana 1:100 000 map sheet (6432).
The revised digital geology map of the Cultana 1:100 000 map sheet and accompanying geological descriptions in this report are the first components of the 2nd edition PORT AUGUSTA 1:250 000 map sheet to be completed. The subject map sheet occupies the...-
Document
Published: 01 Jan 2014
-
Portulacca Ridge. Progress reports to licence expiry/renewal, for the period 16/3/1977 to 15/3/1979.
Areas around Woomera and extending to the north, to around 30 km west of Olympic Dam, were explored for concealed base metal deposits of Olympic Dam - type. Trace stratabound lead and zinc mineralisation (sphalerite and galena - few thousand ppm) had...-
Document