-
False Bay (South). Progress report for the period 23/7/1970 to 22/7/1971.
No text - one plan only, depicting the location and engineering surveyor's details for a planned earth fill embankment, to be constructed within SML 449 on the seaward side of the proposed primary evaporation pond for a 360,000 tons per annum saltworks.-
Document
Published: 23 Jun 1970