-
Leigh Creek Energy geophysical operations - environmental significance assessment. September 2020.
Section 98 of the Petroleum and Geothermal Energy Act 2000 require the minister to classify the activities to which an Environmental Impact Report (EIR) relates as either low, medium or high impact activities. This forms the basis of an Environmental...-
Document
Published: 10 Sep 2020
-
Multi-well exploration and appraisal production testing from deep coal in PEL 96, Cooper Basin - statement of environmental objectives. January 2020.
Section 12 of the Petroleum and Geothermal Energy Regulations 2013 require any person proposing to undertake activities relevant to petroleum exploration to prepare a draft Statement of Environmental Objectives (SEO) prior to exploration commencing....-
Document
Published: 09 Jan 2020
-
South Australian Cooper Basin drilling, completions and well operations - statement of environmental objectives. July 2021.
Section 12 of the Petroleum and Geothermal Energy Regulations 2013 require any person proposing to undertake activities relevant to petroleum exploration to prepare a draft Statement of Environmental Objectives (SEO) prior to exploration commencing....-
Document
Published: 29 Jul 2021
-
SAPEX proposed fracture stimulation Arckaringa Basin – public consultation comments. 2018.
If an activity is deemed by the Department for Energy and Mining (DEM), in consultation with relevant co-regulatory agencies, to be of medium impact according to the criteria for classifying the level of environmental impact of regulated activities...-
Document
Published: 04 Jun 2018
-
Hot Rocks Logistics Support Hub, Cooper Basin SA - environmental impact report. March 2022.
Section 10 of the Petroleum and Geothermal Energy Regulations 2013 require a licensee to prepare an environmental impact report (EIR) detailing the environment of the area included in the scope of the proposed activity. An EIR must identify any events...-
Document
-
PL 03 and 04 South East Pipeline System - environmental impact classification. April 2023.
Section 98 of the Petroleum and Geothermal Energy Act 2000 require the minister to classify the activities to which an Environmental Impact Report (EIR) relates as either low, medium or high impact activities. This forms the basis of an Environmental...-
Document
Published: 01 Apr 2023
-
Beach, geophysical operations in the Otway Basin, South Australia - environmental impact report. April 2021.
Section 10 of the Petroleum and Geothermal Energy Regulations 2013 require a licensee to prepare an Environmental Impact Report (EIR) detailing the environment of the area included in the scope of the proposed activity. An EIR must identify any events...-
Document
-
QSN Link Pipeline, QSN Expansion Pipeline and Moomba Interconnect Pipeline - statement of environmental objectives. April 2020.
Section 12 of the Petroleum and Geothermal Energy Regulations 2013 require any person proposing to undertake activities relevant to petroleum production to prepare a draft statement of environmental objectives (SEO) prior to production operations...-
Document
Published: 01 Jan 2020
-
Leigh Creek Energy exploration drilling operations, PEL 650 - environmental impact classification. March 2020.
Section 98 of the Petroleum and Geothermal Energy Act 2000 require the minister to classify the activities to which an environmental impact report (EIR) relates as either low, medium or high impact activities. This forms the basis of an environmental...-
Document
Published: 01 Jan 2020
-
Moomba to Sydney gas pipeline (PL 7) and Moomba to Sydney ethane pipeline (PL 8) - environmental impact report. February 2021. Archived.
Section 10 of the Petroleum and Geothermal Energy Regulations 2013 require a licensee to prepare an environmental impact report (EIR) detailing the environment of the area included in the scope. An EIR must identify any events associated with the...-
Document
Published: 25 Feb 2021
-
QSN Link Pipeline, QSN Expansion Pipeline and Moomba Interconnect Pipeline - environmental impact classification. April 2020.
Section 98 of the Petroleum and Geothermal Energy Act 2000 require the Minister to classify the activities to which an environmental impact report (EIR) relates as either low, medium or high impact activities. This forms the basis of an environmental...-
Document
Published: 01 Jan 2020
-
Santos Cooper Basin carbon storage - statement of environmental objectives. March 2021.
Section 12 of the Petroleum and Geothermal Energy Regulations 2013 require any person proposing to undertake activities relevant to petroleum production to prepare a draft statement of environmental objectives (SEO) prior to production operations...-
Document
-
Santos Cooper Basin carbon storage - environmental impact report. March 2021.
Section 10 of the Petroleum and Geothermal Energy Regulations 2013 require a licensee to prepare an Environmental Impact Report (EIR) detailing the environment of the area included in the scope of the proposed activity. An EIR must identify any events...-
Document
-
APA South East South Australia Gas Pipeline PL 16 - statement of environmental objectives. April 2022.
Section 12 of the Petroleum and Geothermal Energy Regulations 2013 require any person proposing to undertake activities relevant to petroleum exploration to prepare a draft statement of environmental objectives (SEO) prior to exploration commencing. A...-
Document
Published: 12 Apr 2022
-
APA South East South Australia Gas Pipeline PL16 - environmental impact classification. April 2022.
Section 98 of the Petroleum and Geothermal Energy Act 2000 require the Minister to classify the activities to which an environmental impact report relates as either low, medium or high impact activities. This forms the basis of an environmental impact...-
Document
Published: 19 Apr 2022
-
APA South East South Australia Gas Pipeline PL16 - environmental impact report. April 2022.
Section 10 of the Petroleum and Geothermal Energy Regulations 2013 require a licensee to prepare an environmental impact report (EIR) detailing the environment of the area included in the scope. An EIR must identify any events associated with the...-
Document
Published: 12 Apr 2022
-
Low impact preliminary exploration and survey activities in South Australia - statement of environmental objectives. January 2023.
Sections 12 and 13 of the Petroleum and Geothermal Energy Regulations 2013 require any person proposing to undertake activities relevant to petroleum exploration to prepare a draft statement of environmental objectives (SEO) prior to exploration...-
Document
Published: 01 Jan 2023
-
Extent of low-grade Archaean metavolcanics in the northeastern Gawler Craton: new evidence and definition of the Devils Playground Volcanics.
The bulk of the late Archaean volcanic/volcaniclastic rocks from the Gawler Craton range in age from c. 2535 to 2510 Ma (Fanning, Reid and Teale 2007). However, these units were preceded by an older set of volcanics, the c. 2558 calcalkaline volcanics...-
Document
-
Strata passed through in the Guinewarra, Alballa-Karoo and Roberts Well 2 bores.
The annual Letter Books comprise 19 volumes, which contain primary copies of all of HYL Brown’s early work-related correspondence written after 1882, in his official capacity as SA Government Geologist, to his employer the SA Minister of Mines, plus...-
Document
-
South Australian Magnesium Metal Project.
There is no abstract created for this record-
Document