-
Cocunda and Calca (Poochera Kaolin Project). Progress reports, annual reports, and final reports to licences' full surrender, for the period 12/5/1986 to 28/3/2002.
Kaolin, derived mainly from deep weathering of Hiltaba Suite granites, was the principal target of exploration in the area south and south-west from Poochera, near Streaky Bay on western Eyre Peninsula. Following a review made of historic drillhole...-
Document
-
Data release [made at SA Director of Mines' discretion] : Mount Gunson (part of the Mount Gunson Project). Annual reports for the period 15/7/1994 to 17/10/2008 [ Index Part 4 of 4 ].
During licence Year 12, following encouraging results made by its continuing exploratory drilling, Gunson Resources was able to negotiate a joint venture over the Mount Gunson Project tenements with Falconbridge Limited through its subsidiary Noranda...-
Document
-
Data release - as updated [made at SA Director of Mines’ discretion] : Tootla. Annual reports for the period 6/6/2009 to 13/10/2015.
During the 2009-2010 reporting year, Great Southern Kaolin Pty Ltd (GSK)'s activities comprised: - commissioning the pilot plant at the fabrication site in Kingaroy, Qld, in May-June 2010, and processing about 2 t of kaolinised granite through it to...-
Document
-
Indooroopilly, Muckanippie and Commonwealth Hill. Data release made in lieu of submitting a joint partial surrender report for ELs 5799, 6166 and 6348: all project licences' joint annual reports for the period 21/3/2015 to 30/6/2019.
An agglomeration of exploration licences which partly surrounds the Challenger gold deposit at distances of between 35 and 80 km is being explored for similar type economic lode gold mineralisation that may exist in buried Archaean bedrock relatively...-
Document
-
Nilginee Dam. Annual reports to licence expiry/renewal for the period 15/3/1993 to 14/3/1998.
A low-lying small area situated 40 km west of Whyalla has been explored primarily for economic gypsum occurrences within Recent surficial sediments, while latterly, a search for metallic minerals has also commenced, via a geological survey of basement...-
Document
-
Data release [made at SA Director of Mines' discretion] : Lake Everard. Annual reports to licence expiry/renewal, for the period 7/11/1994 to 6/11/1999.
An originally large licence area centred approximately 70 km south-east of Tarcoola, which lies on the north-western margin of the Gawler Ranges and includes the north-western part of Lake Everard, is being explored for possible buried gold deposits...-
Document
-
Data release [made at SA Director of Mines’ discretion] : Tarcoola. Annual reports to licence expiry/renewal, for the period 2/6/2003 to 1/6/2008.
Exploration Licence 3089 is located in the central Gawler Craton and is centred near the township of Tarcoola. Continuation of tenure over the same area, from former ELs 1827 and 2510, was renewed by Gravity Capital Ltd on 2/6/2003, and full licence...-
Document
-
Warrina. Annual reports and final report to licence expiry/full surrender, for the period 22/3/2006 to 14/11/2013.
Exploration of an area centred 65 km north-east of Coober Pedy has continued from the licensee's previous work aimed at evaluating the IOCG mineralisation potential of Mesoproterozoic basement-hosted, large and regionally significant coincident...-
Document
-
Data release [made at SA Director of Mines’ discretion] : Kottata Well, Eldale, Tootla and Broadacres (also part of the Yaninee Project). First annual report for EL 3135, plus subsequent joint annual reports, for the period 29/9/2003 to 5/6/2009.
An area located on central western Eyre Peninsula between Minnipa and Port Kenny was taken up to explore the Precambrian basement rocks, which are poorly exposed there, for possible economic buried iron oxide - associated copper-gold (IOCG) deposits....-
Document
-
RB 2020/00018 Gawler Craton Airborne Geophysical Survey Region 9B, Kingoonya – Enhanced geophysical imagery and magnetic source depth models
This report presents the results of a study jointly conducted by the Geological Survey of South Australia and CSIRO Mineral Resources which aimed to enhance the expression of geological structure in geophysical images and to derive depth to magnetic...-
Document
Published: 01 Jul 2020
- ZIP,
-
RB 2007/00015 Geochronology of the Gawler Craton, South Australia.
Geochronology enables us to determine the age of rocks and minerals. The variety of isotopic geochronological techniques give complementary information on, for example, the timing of igneous or metamorphic crystallisation, as is often the case for the...-
Document
Published: 01 Sep 2007
-
RB 2019/00012 Gawler Craton Airborne Geophysical Survey Region 4A, Barton – Enhanced geophysical imagery and magnetic source depth models
This report presents the results of a study jointly conducted by the Geological Survey of South Australia and CSIRO Mineral Resources which aimed to enhance the expression of geological structure in geophysical images and to derive depth to magnetic...-
Document
Published: 01 Jul 2019
- ZIP
-
RB 2019/00013 Gawler Craton Airborne Geophysical Survey Region 4B, Fowler – Enhanced geophysical imagery and magnetic source depth models
This report presents the results of a study jointly conducted by the Geological Survey of South Australia and CSIRO Mineral Resources which aimed to enhance the expression of geological structure in geophysical images and to derive depth to magnetic...-
Document
Published: 01 Jul 2019
- ZIP
-
RB 2020/00026 PACE Copper Gawler Craton Airborne Survey, Region 6, Gairdner - enhanced geophysical imagery and magnetic source depth models
This report presents the results of a study jointly conducted by the Geological Survey of South Australia and CSIRO Mineral Resources which aimed to enhance the expression of geological structure in geophysical images and to derive depth to magnetic...-
Document
Published: 01 Oct 2020
- ZIP,
-
RB 2020/00012 Gawler Craton Airborne Geophysical Survey Region 8A, Coober Pedy West – Enhanced geophysical imagery and magnetic source depth models
This report presents the results of a study jointly conducted by the Geological Survey of South Australia and CSIRO Mineral Resources which aimed to enhance the expression of geological structure in geophysical images and to derive depth to magnetic...-
Document
Published: 01 Apr 2020
- PDF,
- ZIP
-
RB 2020/00020 Gawler Craton Airborne Geophysical Survey Region 5, Streaky Bay – Enhanced geophysical imagery and magnetic source depth models.
This report presents the results of a study jointly conducted by the Geological Survey of South Australia and CSIRO Mineral Resources which aimed to enhance the expression of geological structure in geophysical images and to derive depth to magnetic...-
Document
Published: 01 Aug 2020
- ZIP,
-
PACE Theme 2 (drilling partnerships with PIRSA and industry): Year 5 partnership DPY5-29, Wilcherry Hill Magnetite Project, Hercules Proterozoic stratabound iron ore mineral prospect. Project interim and final reports.
Iron ore mineralisation similar to that mined in the Middleback Range has been investigated at the Hercules prospect, located 90 km west-northwest of Whyalla, where a large, high intensity aeromagnetic anomaly and associated 12 km long outcrop of...-
Document
-
Data release [made at SA Director of Mines’ discretion] : Cocata and Warramboo (part of the Eyre Peninsula Project). Annual reports and joint annual reports to licences' joint expiry/renewal, for the period 7/6/1996 to 5/6/2001.
Two adjacent licence areas forming part of a contiguous set of project tenements in the central Eyre Peninsula region are being explored by Adelaide Resources (AR) primarily for gold and base metals, which it is thought may occur in buried deposits...-
Document
Published: 28 Aug 2001
-
[Key SAMREF record for accessing referenced reports and data via DEM Content Manager - SPOT] Cocata and Warramboo (part of the Eyre Peninsula Project). Reports for the period 7/6/1996 to 8/2/2017.
There is no abstract created for this record-
Document
Published: 01 Jun 2017
-
Data release - as updated [made at SA Director of Mines’ discretion] : Tarcoola. Annual reports for the period 2/6/2008 to 29/7/2018.
During the first year of renewed EL 4167, in October and November 2008, Stellar Resources Ltd ("Stellar") completed a 5 hole, 1286.9 m RC and 2 hole, 157.1 m diamond cored inclined drilling programme at the Coolybring prospect which is located...-
Document
Published: 11 Sep 2018