-
Mining Operation plan. ADP2009/019. Two Wells Reeves Plains Sand Pit, Hd Port Gawler, secn 612. July 2009.
LEWISTON NORTH, tenure over short WNW-trending Quaternary dunal sand deposits, with production from 2005-13 for ~400m strike length of >100,000 tonne packing sand.-
Document
-
2014SA005 - Fowler Blocks 1, 2, 3, 4, 5, 6, Bar3 and Yumbarra Block
2014SA005 data processed by DEM Geophysicists from company geophysical data (electromagnetic) completed on the date 2025/04/11. The raw data as provided by the company is in the directory DATA, and processed datasets are in the PROCESSED directory....-
Dataset
- ZIP
-
2016SA004 - Wilcherry Project
The data were originally collected by NRG for Alliance Craton Explorer Pty Ltd. & Trafford Resources Ltd.. Data is provided in text or gdb format and details of the survey can be found in the report file (if available). The data was processed in...-
Dataset
- ZIP
-
2022SA004 - Copper Coast
The data were originally collected by Expert Geophysics Limited for IGO Ltd. & Flinders Prospecting Pty Ltd.. Data is provided in text or gdb format and details of the survey can be found in the report file (if available). The data was processed...-
Dataset
- ZIP
-
GSEL 653 Annual Report - Term 1 Year 2.
This report covers activities undertaken within GSEL 653 during Term 1 Year 2 for the period 17/04/2016 - 16/04/2017.-
Document
Published: 28 Jul 2017
-
Western Stansbury Basin SEEBASE Project
This project was initiated by the Department of Primary Industries and Resources South Australia to augment their marketing campaign to attract new hydrocarbon explorers to the Stansbury Basin by providing new insights into its geology, and hence...-
Document
Published: 01 May 2001
-
Gason 250K Sheet SG 54-13 Geological map (Digital Edition)
GASON, South Australia. Sheet SG/54-13, International Index. 1:250 000 Geological Series Digital Edition-
Map
-
IS HRE002 Approval pathways for standalone BESS – transitioning and new projects
This brochure provides an overview of the three licensing and approval pathways provided for battery energy storage systems under the Hydrogen and Renewable Energy Act 2023.-
Document
Published: 28 Aug 2024