-
Data release [made at SA Director of Mines' discretion] : Bosworth (part of the Lake Torrens Project). Annual reports to licence expiry/renewal, for the period 13/7/1998 to 5/4/2009.
An area covering parts of west-central Lake Torrens and Andamooka Island was taken up by Pima Mining because it was considered a strategic acreage acquisition, since it adjoins the southern boundary of the company's EL 2528 Andamooka already issued to...-
Document
Published: 06 May 1909
-
The Lake Torrens Project; plus the Olympic Domain Project. Joint annual reports for the period 1/1/2006 to 31/12/2010.
Licensee Copper Range originally took up a group of three tenements located in central South Australia covering areas within and west of Lake Torrens, with the intent, much reinforced following the Carrapateena deposit discovery made in 2005, of...-
Document
Published: 04 Mar 1911
-
RB 2001/00017 TER 001, Yorke Peninsula. Well completion report.
Drillhole TER 1, funded by the TEISA program, was drilled to test basement depth and stratigraphy to the west of Minlaton, Yorke Peninsula. This drilling project followed TEISA aeromagnetic and geological surveys of the Peninsula in 1999, which had...-
Document
Published: 01 Nov 2001
-
RB 2016/00009 Geological field excursion guide — IOCGs – where it all began: the Moonta-Wallaroo region of the eastern Gawler Craton.
INTRODUCTION TO THE GUIDE Northern Yorke Peninsula (NYP) is within the southern portion of the Olympic Domain of the eastern Gawler Craton, which is arguably the world’s most fertile IOCG belt. That such a belt existed was only realised when Western...-
Document
Published: 01 May 2016