Parabarana. Progress and technical reports to licence expiry/full surrender, for the period 18/5/1972 to 17/5/1974.
Under a joint venture agreement made between North Flinders Mines and Dampier Mining Co. (a BHP Exploration subsidiary), operative over the 7 square mile SML 705 between 14/9/1973 and 14/3/1974, at least 3500 feet of additional appraisal diamond...-
Document
-
Emu Hill. Progress and annual reports plus final report to licence expiry/full surrender, for the period 22/4/1991 to 21/4/1996.
Diamond exploration undertaken north-west of Moolawatana included the acquisition of airborne magnetic / radiometric and ground magnetic surveys, plus soil, stream sediment, gravel, loam and rock chip sampling, and aircore/diamond drilling (25 holes,...-
Document
-
Data release [made at SA Director of Mines’ discretion] : Arkaroola (part of the Frome Basin Project). Annual reports for the period 3/6/1996 to 4/12/2008. [ Index Part 1 of 2 ].
A 1243 square km rugged mountainous area in the far northern Flinders Ranges extending between Arkaroola, Moolawatana, Prospect Hill, Mount Livingston and Mount Saturday was taken up to explore primarily for gold that it was hoped could exist in...-
Document
-
Mount Fitton. Progress and final reports to licence amalgamation/renewal for the period 19/5/1969 to 31/1/1971.
After reviewing the existing Anaconda regional stream sediment geochemical anomalies, North Flinders Mines attempted to replicate the reported high zinc values in the north-east of the licence area, by conducting a higher density reconnaissance stream...-
Document