-
RB 77/00080 Kalangadoo town water supply. Well completion report, Kalangadoo TWS no. 1 (MA 94).
Kalangdoo Town Water Supply (T.W.S.) No. 1 well was drilled cable tool during February - May, 1977, and subsequently production tested. The unconfined Gambier Limestone aquifer was encountered between 5.5 and 86m, and was later cemented off down to...-
Document
Published: 01 Jan 1977
-
RB 74/00013 Beachport town water supply flow and pump testing of bore no. 2, completion report and recommendations, Hd Rivoli Bay, bore no. 610999002.
The development and testing of the Beachport Town Water Supply Bore No. 2, was badly handicapped by incorrect screen selection, an apparently insensitive pressure gauge, and incomplete development of the bore prior to testing. The transmissivity of...-
Document
Published: 01 Jan 1974