-
Economic analysis of heap and in-situ leaching of remnant ore, Mount Gunson.
2 million tonnes of low grade 0.64% Cu ore is about to be covered with overburden. At present copper prices, both heap leaching in the open pit area and in situ leaching would result in an annual running cost deficit of about $155 000 - $160 000 per...-
Document