-
Anna Creek and Belt Bay. Joint first partial surrender report, for the period 3/7/1995 to 2/7/1996.
Base metal exploration undertaken 160 km east of Coober Pedy was initiated with an assessment of joint MIM/MESA SAEI airborne magnetics and existing MESA SA_GEODATA database drillhole information. The depth to economic mineralisation over the licence...-
Document
-
Anna Creek, Belt Bay and London Springs (the MIM West Lake Eyre Project). Joint first annual report for the period 3/7/1995 to 2/7/1996.
Major fault intersections, possibly prospective for Olympic Dam-style copper mineralisation, were defined by an aeromagnetic survey carried out west of Lake Eyre in conjunction with MESA. The features were not further investigated because of a shift...-
Document