-
Glyde Hill. Annual reports for the period 18/6/97 to 17/6/99.
Geochemical sampling was carried out in an area of poor calcrete development on the southern shores of Lake Everard, 80 km south south-west of Kingoonya. Peak analyses of 5-7 ppb Au were seen to be coincident with interpreted structural features...-
Document