-
Mount Gunson (part of the Mount Gunson Project). Third partial surrender report, for the period 16/6/1994 to 22/9/2010.
No work has been undertaken recently on the currently relinquished portion of EL 4460. However, previously this piece of ground, located between Lake Dutton and the southern end of Pernatty Lagoon, has formed part of three successive licences held...-
Document
-
Mount Gunson, Woocalla, Bernard Hill, Mount Moseley and Emmie Bluff (the Mount Gunson Project). Respective second to fourth partial surrender reports, for the overall period 15/7/1994 to 12/10/2004.
No work has been undertaken on the currently relinquished portions of ELs 3112, 2639, 3008 and 3022. However, as an attachment to the current EL 3112 relinquishment report, all technical data for Stuart Metals' recent diamond drillhole MGD24 (to...-
Document
-
Data release [made at SA Director of Mines' discretion] : Mount Gunson (part of the Mount Gunson Project). Annual reports for the period 15/7/1994 to 17/10/2008 [ Index Part 3 of 4 ].
During the eighth year of tenure, work done on EL 2639 included: - the conduct of infill ground gravity and CSAMT surveys; - geophysical modelling and interpretation of the new survey data; - geological interpretation and refinement of drilling...-
Document
-
Data release [made at SA Director of Mines' discretion] : Mount Gunson (part of the Mount Gunson Project). Annual reports for the period 15/7/1998 to 17/10/2008 [ Index Part 2 of 4 ].
Stuart Metals is primarily exploring EL 1946 for stratiform copper mineralisation of the various styles known to be present in the Mount Gunson district. In addition, the company regards the largely unknown Mesoproterozoic basement to have strong...-
Document
-
Data release - as updated [made at SA Director of Mines' discretion] : Mount Gunson (part of the Mount Gunson Project). Annual reports for the period 18/10/2008 to 24/3/2018.
During licence Year 15 (2008-2009), activities at Mount Gunson comprised: - pegging of three Mineral Claims at the MG 14 deposit in December 2008; - acquiring part of a larger project-wide ground gravity survey during April-May 2009 (510 stations...-
Document
Published: 22 Aug 1918