-
Data release [made at SA Director of Mines' discretion] : Mutooroo. Annual reports to licence expiry/renewal, for the period 16/1/1997 to 2/4/2007. [ Index Part 1 of 2 ].
Palaeoproterozoic Willyama Supergroup metasediments, intrusive igneous rocks and volcanic rocks, plus Mesoproterozoic granitoids and associated mafic dykes, which occupy the south-western corner of the Broken Hill basement domain in an area centred...-
Document
-
Data release [made at SA Director of Mines' discretion] : Mutooroo. Annual reports to licence expiry/renewal, for the period 16/1/1997 to 2/4/2007. [ Index Part 2 of 2 ].
Activity during Licence Year 5 was less than in the year before, mainly owing to BHP-Billiton having decided at the end of the Phase 1 drilling programme to withdraw its joint venture agreement funding from the Mutooroo and Thackaringa tenements,...-
Document
-
Mutooroo (latterly part of the Border JV Project). Second partial surrender report at licence expiry/renewal, for the period 16/1/1997 to 18/4/2017.
Four separate large portions of a long-held licence area abutting the SA/NSW state border in the vicinity of Mutooroo have been relinquished as part of statutory requirements. The following summary prepared by Minotaur Exploration describes work done...-
Document