-
The Lake Torrens Project; plus the Olympic Domain Project. Joint annual reports for the period 1/1/2006 to 31/12/2010.
Licensee Copper Range originally took up a group of three tenements located in central South Australia covering areas within and west of Lake Torrens, with the intent, much reinforced following the Carrapateena deposit discovery made in 2005, of...-
Document
Published: 04 Mar 1911
-
The Olympic Domain Project. Joint annual reports for the period 1/1/2011 to 31/12/2016, plus individual licence full surrender final reports.
During the sixth year of the project, three gravity anomalies located on West Lake Torrens EL 4754, a short distance east of the Carrapateena IOCG prospect, were identified by Copper Range as worthy of follow up. A detailed infill ground gravity...-
Document
Published: 01 Mar 1919