-
Roxby Downs North (part of the Olympic Domain Project). Final report at licence surrender for the period 18/6/2007 to 17/6/2009.
During its 2-year tenure of EL 3810, which consisted of two parcels of ground situated 25 to 70 km north-west of the Olympic Dam mine, Copper Range undertook a review of existing geological and geophysical data and identified a ring structure and...-
Document
Published: 17 May 1909
-
The Lake Torrens Project; plus the Olympic Domain Project. Joint annual reports for the period 1/1/2006 to 31/12/2010.
Licensee Copper Range originally took up a group of three tenements located in central South Australia covering areas within and west of Lake Torrens, with the intent, much reinforced following the Carrapateena deposit discovery made in 2005, of...-
Document
Published: 04 Mar 1911