-
Pelican Point. Information status at licence expiry, for the period 15/3/2010 to 14/3/2012 : no work performed.
There is no abstract created for this record-
Document
-
Data release - as updated [made at SA Director of Mines' discretion] : The North-western Murray Basin Project. Joint annual reports for the period 29/8/2012 to 28/8/2014.
During Year 7 of the project, Goldfields did no more field work, but undertook office-based analyses of bedrock geochemical and geological data obtained in its 2012 aircore drilling campaign. Image processing and interpretation of the Canegrass...-
Document
Published: 28 Feb 1915
-
Data release - as updated [made at SA Director of Mines' discretion] : The North-western Murray Basin Project. Joint annual reports for the period 29/8/2006 to 28/8/2012.
Twelve licence areas owned and operated by Gold Fields Australasia (GFA), comprising two subareas respectively located approximately 50 km east of Burra and 15 km south-east of the Benda Range, on the eastern edge of the Adelaide Fold Belt, are being...-
Document
Published: 29 Sep 1912