-
Mutooroo. Progress reports for the period 19/4/80 to 3/10/86.
Mines Exploration re-assessed the 1975 mining feasibility study and carried out reconnaissance and detailed Sirotem surveys over the deposit. Noranda conducted follow up gravity and magnetic ground surveys and an experimental Max Min II EM survey...-
Document