-
EPP 23, Otway Basin, South Australia. Evaluation report.
In order to examine the prospectivity of EPP 23, for which they assumed the operatorship by a 65% farm-in in August 1990, BHP Petroleum have examined well palynological and geochemical data in and around the permit and have interpreted over 600 km of...-
Document
-
1991 marine seismic survey, Otway OH91 (portion), final report.
AIM: The portion of the BHP basin-wide offshore Otway OH91 marine seismic survey that was conducted within EPP 23 sought to detail certain prospects and leads identified from the interpretation of 1990 and earlier data, and included a regional strike...-
Document
-
1990 marine seismic survey, 'Rhonda' 'B' portion, final report.
AIM: The permit Year 3 Rhonda 'B' seismic programme in EPP 23 was designed to identify a target for drilling with the permit Year 4 commitment well, preferably addressing a play type different to that tested by the unsuccessful Copa 1 (the permit Year...-
Document
-
EPP 23 progress and technical reports for the period 24/6/87 to 6/3/92.
There is no abstract created for this record-
Document