-
RB 2015/00019 Manual of geochemical leaching trials, 2010–2014; Brukunga Mine Remediation Program - Phase 3.
The Brukunga mine site is a former open pit iron sulfide mine that continues to contribute to Acid and Metalliferous Drainage (AMD) into downstream waterways. Mine-based sources of AMD include the waste rock dumps and tailings storage facility. In...-
Document
Published: 01 Jun 2015
-
RB 79/00023 Brukunga pyrite mine - Drillhole analyses and mine development plan inventory.
BHP have provided SADME with unpublished data on the inoperative Brukunga pyrite mine. This report is an inventory of these data, providing access to the mine development plans and analytical data on two diamond drill holes.-
Document
Published: 01 Jan 1979