-
2007 Kilsby Detailed Gravity Survey, PEL 187.
Neo Oil Ltd recorded the 2007 Kilsby Detailed Gravity Survey as a follow up on the previous years’ Mt Gambier Gravity Survey in PEL 187. The survey was recorded during January 2007. The survey was located along N-S grid lines spaced 400 m apart....-
Document
-
2006 Mt gambier Gravity Survey, PEL 187.
Neo Oil Pty Ltd recorded the 2006 Mt Gambier Gravity Survey south west of Mt Gambier during January- February 2006. The survey comprised 566 new gravity stations spaced approximately 500m apart on tracks and roads in the western portion of PEL187....-
Document