-
RB 88/00007 Stuart Highway, Pimba to Wirrappa, section and Pimba to Olympic Dam Road, drilling for construction water, 1987.
6 of 11 wells were productive. All were fractured rock aquifers, but only 1 showed radial flow rather than a linear flow response. Yields ranged from 0.7 L/s to 8 L/s and salinities from 16 000 mg/L to 2356 000 mg/L. The occurrence at depth of...-
Document
Published: 01 Jan 1988
-
Olympic Dam Project. [Artesian] mound springs of the Lake Eyre South region [environmental] monitoring : half-yearly reports for the period from April 1998 to October 2005.
There is no abstract created for this record-
Document
-
Olympic Dam Project - Hydrogeology of the Olympic Dam mine site.
There is no abstract created for this record-
Document
Published: 07 Sep 1999
-
Olympic Dam Project : operator's reports on hydrogeological investigations, Great Artesian Basin wellfields, for the period 1995-2004.
There is no abstract created for this record-
Document
-
Olympic Dam operations. Environmental management programme annual report. 01/03/90 - 28/02/91.
Reports on monitoring of: - air and solid waste pollution; - drill pad rehabilitation; - meteorology, vegetation, flora, fauna and soil salinity; - mine ground water drainage; - artesian water drawdown at Wellfield A in the Great Artesian Basin;...-
Document