-
Olympic Dam Project. [Artesian] mound springs of the Lake Eyre South region [environmental] monitoring : half-yearly reports for the period from April 1998 to October 2005.
There is no abstract created for this record-
Document
-
Olympic Dam operations. Environmental management programme annual report. 01/03/90 - 28/02/91.
Reports on monitoring of: - air and solid waste pollution; - drill pad rehabilitation; - meteorology, vegetation, flora, fauna and soil salinity; - mine ground water drainage; - artesian water drawdown at Wellfield A in the Great Artesian Basin;...-
Document