-
Mount Igy. Progress reports to licence expiry/full surrender, for the period 13/3/1980 to 12/9/1981.
TARGET: To define lignite in the Wilkinson Lakes lignite deposit which is of a composition that would be suitable to undergo carbon beneficiation and/or coal liquefaction processes; also, any economic oil shale occurrences and/or sedimentary uranium...-
Document
Published: 02 Sep 1981
-
Emmie Bluff. Progress reports and annual reports to licence expiry/full surrender, for the period 21/6/1976 to 20/6/1978.
Ongoing exploration for possible buried Olympic Dam-style Cu-Au-U mineralisation, conducted over an area of the Stuart Shelf located 15 km south-east of Arcoona Homestead, has comprised RC drilling (20 holes, aggregate penetration 1768 m) and diamond...-
Document
-
Portulacca Ridge. Progress reports to licence expiry/renewal, for the period 16/3/1977 to 15/3/1979.
Areas around Woomera and extending to the north, to around 30 km west of Olympic Dam, were explored for concealed base metal deposits of Olympic Dam - type. Trace stratabound lead and zinc mineralisation (sphalerite and galena - few thousand ppm) had...-
Document
-
Oolgelima Hill. Progress reports plus second partial surrender report, for the period 14/7/1983 to 14/10/1986.
Evaporite minerals in black shale at the base of the Early Cretaceous Bulldog Shale near the western margin of the Eromanga Basin were the target about 50 km NE of Coober Pedy. Reconnaissance mapping, soil sampling, auger drilling and the backhoe...-
Document
Published: 03 Nov 1986
-
Emmie Bluff. Progress reports to licence expiry/full surrender, for the period 3/3/1975 to 2/3/1976.
Exploration for possible economic buried Olympic Dam-style Cu-Au mineralisation, undertaken over an area located 15 km south-east of Arcoona Homestead, comprised preliminary airphoto interpretation and surface geological mapping, outcrop sample...-
Document
Published: 12 Mar 1976
-
Red Lake. Progress reports to licence expiry/renewal, for the period 12/1/1976 to 11/1/1978.
The exploration target for stratabound base metals in the Red Lake area, which lies just to the east of Pernatty Lagoon and abuts the Arcoona Plateau, was the top of Pandurra Formation erosional surface. Percussion (17 holes totalling 2619 m) and...-
Document
-
Hydrogeological mapping pilot study. BALLARAT 1:250 000 sheet - Explanatory Notes.
The map has been prepared on the INTERGRAPH system as a final digitized draft map, but is not included with the report.-
Document
Published: 01 Jan 1986
-
State Energy Research Advisory Committee (SENRAC) Project 2/86 - Moomba and Big Lake Fields, log and special core analysis for improved reserves assessment. Analytical data and progress reports for the period August 1987 to January 1989.
This project, initiated and managed by SADME, aimed to improve in-house methods of petrophysical log analysis in order to more reliably estimate producible gas reserves in the Moomba and Big Lake Fields, via more accurate estimation of reservoir...-
Document
Published: 18 Jan 1989
-
Lake Frome South and Lake Frome North (the Wertaloona Project). Joint annual reports to licences' surrender, for the period 8/11/2010 to 3/9/2013.
The southern half of Lake Frome salina, centred about 80 km south-southeast of the Beverley uranium mine, has been explored for possible commercial quantities of dissolved lithium and uranium. Interest in the former commodity was engaged by the...-
Document
Published: 11 Oct 2013
-
Data release - as updated [made at SA Director of Mines’ discretion] : Warramboo (the Central Eyre Project). Annual reports [but excluding four separately held joint annual reports] for the period 6/6/2001 to 8/2/2019.
During the sixth year of tenure of the Warramboo licence, now held by Adelaide Exploration Limited as renewed EL 2846 covering the same 1363 square km area as before, the only exploration-related activity which occurred was the acquisition during...-
Document
Published: 28 Mar 2018
-
Data release - as updated [made at SA Director of Mines' discretion] : Mount Davies (part of the Central Giles / Wingellina Nickel Project). Annual reports for the period 24/9/2009 to 23/9/2018.
Field work performed on the subject tenement during licence Year 8 included the conduct of Aboriginal heritage clearance surveys by the APY Traditional Owners to grant access for geological mapping and the acquisition of a trial seismic survey, as...-
Document
Published: 23 Nov 2018
-
Data release - as updated [made at SA Director of Mines' discretion] : The North-western Murray Basin Project. Joint annual reports for the period 29/8/2006 to 28/8/2012.
Twelve licence areas owned and operated by Gold Fields Australasia (GFA), comprising two subareas respectively located approximately 50 km east of Burra and 15 km south-east of the Benda Range, on the eastern edge of the Adelaide Fold Belt, are being...-
Document
Published: 29 Sep 2012
-
Lake MacFarlane. Combined first annual / final report at licence expiry/full surrender, for the period 20/1/2016 to 19/1/2017.
Laboratory analysis of 18 samples of groundwater seepage brine collected from Lake MacFarlane during June-July 2016 indicated that the lake was unlikely to host an economically viable potash resource, and therefore the mineral exploration licence...-
Document
Published: 30 Nov 2016
-
PACE Theme 2 (drilling partnerships with PIRSA and industry): Year 5 partnership DPY5-40 - western Middleback Range region - Stony Hill area Archaean to Proterozoic stratabound iron ore mineral prospects. Project final report.
Banded iron formation (BIF) rock outcrops and an associated 15 km long aeromagnetic anomaly located about 20 km west of Iron Baron were chosen by Centrex Metals as high quality targets deserving of exploration for economic iron mineralisation...-
Document
Published: 28 Nov 2008
-
Gibraltar Rocks. Annual reports and final report to licence full surrender, for the period 30/4/2001 to 24/11/2008.
Exploration of an area with poor basement outcrop located approximately 40 km north of Tarcoola, primarily sought possible fault or breccia-hosted mesothermal gold +/- base metal mineralisation in likely multiphase Mesoproterozoic felsic volcanic and...-
Document
Published: 14 Aug 2008
-
PACE Theme 2 (drilling partnerships with PIRSA and industry): Year 1 partnership DPY1-47 - [prospecting for] water in Permian palaeochannels draining the Mount Woods Inlier. Project final report.
Development of the Prominent Hill copper-gold deposit in the Mount Woods region will require an adequate source of water to support planned mining and ore processing operations, currently estimated to involve at least 6 million tonnes of ore per year....-
Document
Published: 10 Jun 2005
-
Mundowdna, Wilpoorinna, Dalarinna Hill and Calcutta (the Marree Project). Combined annual reports plus final reports to licences' respective expiry or surrender, for the period 21/6/2006 to 29/5/2014.
The Marree Project consists of four adjacent exploration licences, ELs 3574, 3577, 3578 and 3579, which together cover 3909 square km. Work performed on the project was governed by the Eromanga Basin joint venture agreement made between Eromanga...-
Document
Published: 30 May 2014
-
Coffin Bay (originally part of the Wanilla JV Project). Annual reports plus final report to licence expiry/full surrender, for the period 3/3/2005 to 2/3/2010.
A tenement in the Coulta district of south-western Eyre Peninsula has lately been explored by International Metals, after its prior research had outlined seven areas there as being of prime interest in a search for Archaean greenstone units which...-
Document
Published: 20 May 2010
-
Lake Torrens Areas 1 and 2, Lake Torrens South and Lake Torrens North (the Lake Torrens Brine Potash Project). First joint annual report plus final report to licences' joint full surrender, for the period 5/1/2015 to 16/6/2016.
Much of the eastern side of the very large, 5,745 square km saline playa Lake Torrens, which occupies one of the most arid parts of Australia, was taken under licence by a Northern Territory - based company with the intent of systematically sampling...-
Document
Published: 14 Jun 2016
-
Merty Merty (part of the Big Lake Project). Final report for approved geophysical program, Project ADI RD01-109 [part of Accelerated Discovery Initiative Round 1, 2021].
An ADI funds grant of ~A$152,400 has been provided to Alligator Energy to assist it with conducting further greenfields exploration for in situ recoverable secondary uranium mineralisation that may have formed within Tertiary cover sediments in the...-
Document
Published: 20 Aug 2021